I had a friend that brought a machinist leveler today. We leveled the machine so it's ready for some action.
I then spent some time designing a BT30 holder to be able to swap tools on my holders easy. When I made a post for it the program was 120kB. I managed to split the code to two files with 60kB each so I can run them but this will become a hassle. The design was stupid simple so this limit is going to limit my use alot. I need to edit the PMC ladder so I can use drip feed. Does anyone know my options on how to do this? What tools do I need to read out the UVProms -> change the ladder -> load the ladder onto new uvproms?
FA
NUC A02B-0098-C199