Air op conversion

Results 1 to 2 of 2

Thread: Air op conversion

  1. #1
    Member
    Join Date
    May 2016
    Location
    United States
    Posts
    16
    Downloads
    0
    Uploads
    0

    Default Air op conversion

    I finally got off my butt and completed my air op conversion on my machine. Mounted a shortened 2 stage air cylinder without drilling a single hole in the machine. Manufactured supports with 2 diagonal having support blocks above and below z axis. Brackets below z axis prevent any possibility of support spread. All steel parts TIG welded. Control valve is mounted to small steel plate bolted to trailer light magnet. It's massive overkill on support but leaves easy accessibility to everything.

    Similar Threads:
    Attached Thumbnails Attached Thumbnails Air op conversion-control-valve-jpg   Air op conversion-spindle-bracket-jpg   Air op conversion-control-valve-jpg   Air op conversion-spindle-bracket-jpg  

    Air op conversion-control-valve-jpg   Air op conversion-spindle-bracket-jpg  


  2. #2
    Member
    Join Date
    Nov 2011
    Location
    usa
    Posts
    38
    Downloads
    0
    Uploads
    0

    Default Re: Air op conversion

    I see the new machines have the power drawbar as a standard feature plus a BT 30 spindle- nice upgrades .



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Air op conversion

Air op conversion