Takeover settings from 7.0.8 to 7.0.12

Results 1 to 3 of 3

Thread: Takeover settings from 7.0.8 to 7.0.12

  1. #1
    Registered maschneide's Avatar
    Join Date
    Oct 2010
    Location
    Tuttlingen
    Posts
    5
    Downloads
    0
    Uploads
    0

    Default

    Hello,
    We are currently working with PEPS V7.0.8 under WinXP.
    As we will get a new hardware soon and switch to Win7x64, I am preparing a computer with PEPS V7.0.12 as a test.

    Now I want to transfer the settings, macros and adjusted PPs from my productive PC (7.0.8) to my new computer (7.0.12), so that the user experienences a familiar environment.

    Now I need to know what sub-folder or files from the program dictionary (C:Program Files (x86)PEPSV7.0) need to be copied so that my plan works out?

    Many thanks and regards
    Martin



  2. #2
    Registered Yardman's Avatar
    Join Date
    Jun 2008
    Location
    Weinstadt
    Posts
    39
    Downloads
    0
    Uploads
    0

    Default

    Hello Maschneide

    What module do you have?

    Erode,milling, turning?

    Greetings Yardman



  3. #3
    Registered maschneide's Avatar
    Join Date
    Oct 2010
    Location
    Tuttlingen
    Posts
    5
    Downloads
    0
    Uploads
    0

    Default

    Hello Yardman
    We have the modules wire cut EDM, pentacut and fabrication with different control systems
    Have you got a hint?

    Many thanks

    Maschneide



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Takeover settings from 7.0.8 to 7.0.12

Takeover settings from 7.0.8 to 7.0.12

Takeover settings from 7.0.8 to 7.0.12