- Manage dynamic schedules
-
Member
Manage dynamic schedules
I manage a small machine shop in California with about 20 CNC machines (all our work is job shop type work). I recently had a VP wander through my shop, and he noticed that six of the machines were on setup. He has previously stated that he ran a machine shop in the past and I frequently get inquiries from him. This time however he stated that he does not understand how 6 machine can be on setup simultaneously. He has further asked if I can develop a process to minimize the number of machines on setup simultaneously. Does anyone have a good method for doing this?
Similar Threads:
-
- Manage dynamic schedules
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules