    Default Getting the machining time

    In Mill Expert, I am not having much luck getting a useful estimate of the time required to machine on the job sheet. Anyone got any useful tips on this?

    Are you having good luck? Maybe its because of my post processor selection? You would think that getting the length of the various chains, and multiplying by the applicable feedrates would be child's play?

    Similar Threads:
    First you get good, then you get fast. Then grouchiness sets in.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  2. #2
    Member wms's Avatar
    Join Date
    Mar 2003
    Location
    wyoming
    Posts
    927
    Downloads
    0
    Uploads
    0

    Default Machine times

    Hu,
    I've had real good luck with this feature. I recently ran a job that had 6 tool changes, used the rest robot, and the time OneCNC calculated was 8 minutes and 26 second. Actual machine time was 8 minutes and 42 seconds. I attribute the difference to tool change time and that OneCNC figures rapid moves at 10000 (which is cofigurable). So I should change this. Just need to figure out what to change it to.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  3. #3
    Member wms's Avatar
    Join Date
    Mar 2003
    Location
    wyoming
    Posts
    927
    Downloads
    0
    Uploads
    0

    Default Mchine time

    Hu,
    Just a thought, and maybe you have already tried this, but have you tried running your program thru a standard post, say Haas or Fanuc? Maybe the custom post you have dosen't know how to handle all you are throwing at it. If it is better time wise thru a different post then you could use that for estimation purposes.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  4. #4
    Member HuFlungDung's Avatar
    Join Date
    Mar 2003
    Location
    Canada
    Posts
    4826
    Downloads
    0
    Uploads
    0

    Default

    The thing is that the job sheet is independent of the post selection, that is you can pull up the same job sheet regardless of what machine you want to use.

    So it seems to me that the machining time should be a function of the CAD chain length multiplied by the feedrates.

    I've tried many different values in the NC setup Machine rapid speeds and this value seems irrelevant at this stage, too. The job sheet gives exactly the same time, no matter what I put in.

    Give you an example: I did a planar finishing pass at at stepover of .005 and a surface accuracy of .001. producing 47000 lines of code. This was clocked to be 6 hours and something.

    Then, I redid the finish pass again at a stepover of .004 and a surface accuracy of .0005, producing 69000 lines of code, but the machining time is only 3.5 hours.

    It sounds like some kind of a math glitch in the internal formula.

    Last edited by HuFlungDung; 05-14-2003 at 03:19 PM.
    First you get good, then you get fast. Then grouchiness sets in.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  5. #5
    Member wms's Avatar
    Join Date
    Mar 2003
    Location
    wyoming
    Posts
    927
    Downloads
    0
    Uploads
    0

    Default Machine Time

    HU,
    I believe your right. The machine time appears to be tied to the cad drawing not the post.

    I did a test and here are the results:

    z-level rf at .025 depth of cut: time 6 hours 40 minutes.
    same at .050 depth: time 5 hours 42 minutes

    then radial finish at feed of 24.: time 5 hours 42 minutes
    same at feed of 40.: time 5 hours 9 minutes
    then same with feed at 80. : time 4 hours42 minutes

    So it appears that my system (or circumstances) is at the very least making changes to the time sheet.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  6. #6
    Member wms's Avatar
    Join Date
    Mar 2003
    Location
    wyoming
    Posts
    927
    Downloads
    0
    Uploads
    0

    Default Machine time round 3

    Hu,
    I just did another test with Planar finish to make sure that was ok also.

    Planar finish feed at 15 : time 2 hours 29 minutes
    same as above feed at 30 : time 1 hour 14 minutes

    Just as it should be. About 1/2 the time by doubling the feed.

    I don't know what to tell ya. You cuold e-mail me the file and I'll run it thru my system and see it it differs from your figures.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  7. #7
    Member HuFlungDung's Avatar
    Join Date
    Mar 2003
    Location
    Canada
    Posts
    4826
    Downloads
    0
    Uploads
    0

    Default

    I took the tap file and checked it with another program and it seems to give me the same results as Onecnc's job sheet. So it must be correct.

    I must have misjudged the parameters I was using that I spoke about above, because I cannot reproduce that type of discrepancy again.

    Also, I guess that maybe I am just expecting it to take longer because of the way I used to cut these molds. Beforehand, I didn't dare use as large of a cutter as I am now, because I was fearful of leaving too much material in unknown areas. Gotta hand it to those Onecnc guys, the Rest Robot is a cool feature and takes some getting accustomed to.

    First you get good, then you get fast. Then grouchiness sets in.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  8. #8
    Member wms's Avatar
    Join Date
    Mar 2003
    Location
    wyoming
    Posts
    927
    Downloads
    0
    Uploads
    0

    Thumbs up Rest robot

    Hu,
    That Rest Robot is a real time saver, yes indeed!
    Glad you got the time thing figured out. I thought I was loosing my mind. Well maybe I am anyway.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  9. #9
    Member HuFlungDung's Avatar
    Join Date
    Mar 2003
    Location
    Canada
    Posts
    4826
    Downloads
    0
    Uploads
    0

    Default Finale

    Results of running the gcode program: the machining time is basically correct as output by the job sheet. So there is no problem after all.

    Call me doubting Thomas, I guess.

    First you get good, then you get fast. Then grouchiness sets in.

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Getting the machining time

Getting the machining time