XR7 Mill Pro and multi vise fixture - help!


Results 1 to 2 of 2

Thread: XR7 Mill Pro and multi vise fixture - help!

  1. #1
    Member
    Join Date
    Apr 2006
    Location
    usa
    Posts
    19
    Downloads
    0
    Uploads
    0

    Default XR7 Mill Pro and multi vise fixture - help!

    I am running a Fadal 3016 with XR7 Mill Pro.
    I have a nice multi vise fixture set up with 6 pcs ready to go and a complicated program to get running.
    I need to use the multi vise, multi offsets type of repeat.

    I am struggling a bit with the Post set up.
    Two things I can't figure out:
    1. The Post automatically starts numbering subroutines starting from 100.
    The Fadal control can only accept subs numbered from 01 to 89.
    Is there a way to fix the sub numbering provided by the Post? Or can I do math within the Post to fix this such as {(RN-99)} instead of {RN}?

    2. The Post puts the main program at the beginning of the NC listing and the subroutines at the end.
    The Fadal control requires the subs to be at the beginning of the listing and the main program to follow the subs.
    Is there a way to control this output to get the subs listed at the beginning?

    Thanks for any help (I'm stuck with manual editing on a giant program if I can't figure this out!)

    RC

    Similar Threads:


  2. #2
    Member
    Join Date
    Apr 2006
    Location
    usa
    Posts
    19
    Downloads
    0
    Uploads
    0

    Default Re: XR7 Mill Pro and multi vise fixture - help!

    I figured it out.
    Thanks!
    RC



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

XR7 Mill Pro and multi vise fixture - help!

XR7 Mill Pro and multi vise fixture - help!