Does anyone have the dust shoe file? I can't seem to find it.
I've made some small additions to the original Joes 2006 while I tried to keep the original design in the new parts.
At first I installed a rail at the backside of the gantry, which is simply attached to the PE bearing mounts. The rail is used for the limit switches and the cable carrier.
A similar attachment is mounted to the right side close to the Y-axis bearings. Also here the cable carrier is connected, as well as the limit switches and some part to fix the hose from the vacuum.
To clean the the parts while cutting the vacuum is connected close to the router. The brush is fixed by some strong magnets to remove it quickly when necessary.
Greetings
Cornelius
Does anyone have the dust shoe file? I can't seem to find it.