HAAS VF2SS with NexGen Control - Date Legacy Variable


Results 1 to 2 of 2

Thread: HAAS VF2SS with NexGen Control - Date Legacy Variable

  1. #1
    Member gortboy's Avatar
    Join Date
    Oct 2020
    Posts
    1
    Downloads
    0
    Uploads
    0

    Default HAAS VF2SS with NexGen Control - Date Legacy Variable

    I'm looking to date stamp programs as they are run in our HAAS's. I see that #3011 is current date, is there a way to write this variable to the program so it shows inside the body of the current program?

    Thx,

    Gortboy

    Similar Threads:


  2. #2
    Member jrfiggz1's Avatar
    Join Date
    Sep 2021
    Posts
    7
    Downloads
    0
    Uploads
    0

    Default Re: HAAS VF2SS with NexGen Control - Date Legacy Variable

    You can't really have the control automatically edit the running program. You can, however, DPRNT that information and if you also have your program DPRNT the program number (make it a standard for whomever is writing your programs or put it into your post if you are using CAM).

    If you have multiple machines, I would recommend connecting them to a local network and having them all write to a file on said network along with machine ID so that you know exactly which machine ran which program on which date. It's a bit involved, but if you have questions you can always reach out...



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

HAAS VF2SS with NexGen Control - Date Legacy Variable

HAAS VF2SS with NexGen Control - Date Legacy Variable