Delayed Start on a Haas ( Is this possible ? )

Results 1 to 5 of 5

Thread: Delayed Start on a Haas ( Is this possible ? )

  1. #1
    Member
    Join Date
    May 2013
    Location
    United States
    Posts
    160
    Downloads
    0
    Uploads
    0

    Default Delayed Start on a Haas ( Is this possible ? )

    I would like to have my Haas Super Mini mill start up at a specific time in the middle of the night so that the job is complete first thing in the morning..... ( I could start it at the end of the day... but I've found that that my coolant will leave stains on my aluminum parts by morning )

    Is there any way to setup a delayed start?

    One option I was thinking of trying was putting a dwell command at the beginning of my code... but haven't tried that yet.

    I'm a one man shop.... and my machine / shop is next to my house.... so there's no concerns of the machine starting up on it's own ( no employees around to get injured )

    Thanks,

    Kent

    Similar Threads:


  2. #2
    Community Moderator Jim Dawson's Avatar
    Join Date
    Dec 2013
    Posts
    5717
    Downloads
    0
    Uploads
    0

    Default Re: Delayed Start on a Haas ( Is this possible ? )

    First I would change coolant. We use Blasocut 2000 CF, and mostly run aluminum. Have not noted any staining at all, even parts sitting for days.

    I don't know how large of a number Haas will take in a G4 Pxxxx command but it's worth a try.

    A programmable digital timer,about $25 from Home Depot, driving a relay. Wire the relay contacts in parallel with the cycle start switch. Program the timer to come on for 1 minute, the programmable minimum, then turn off again. I don't know if the Hass will accept the cycle start button being ''pushed'' for 1 minute. May require a time delay relay to make it a momentary ''push'' of one second or so.

    Having said all that, I could see this going south in a hurry if there were a problem. Be very careful.

    Jim Dawson
    Sandy, Oregon, USA


  3. #3
    Member machinehop5's Avatar
    Join Date
    Aug 2009
    Location
    United States
    Posts
    1570
    Downloads
    5
    Uploads
    2

    Default Re: Delayed Start on a Haas ( Is this possible ? )

    ..at the beginning of program add a block skip Line with a X or Y feed move of say F.050 would be 20 minutes/inch
    or maybe something here
    https://www.google.com/search?q=rube...ZChabIa_CFOxqM

    Last edited by machinehop5; 07-23-2020 at 07:04 PM.


  4. #4
    Member
    Join Date
    May 2013
    Location
    United States
    Posts
    160
    Downloads
    0
    Uploads
    0

    Default Re: Delayed Start on a Haas ( Is this possible ? )

    Thank You very much for the info Jim....

    After thinking about this I agree with your last comment about things going south in a hurry...

    I could easily see me walking into the shop in the morning and seeing my mill in a 1,000 pieces on the floor!

    I think I better stay clear of this plan... ( Theres probably a good reason why this feature isn't built into the system! )

    Thanks again...

    Kent



  5. #5
    Member
    Join Date
    May 2013
    Location
    United States
    Posts
    160
    Downloads
    0
    Uploads
    0

    Default Re: Delayed Start on a Haas ( Is this possible ? )

    Thanks much for the info.... after thinking about this more I'm probably asking for problems having my mill start up by itself.... so I better stay with my current plan ( running out to my shop in the middle of the night Ha..ha.. )



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Delayed Start on a Haas ( Is this possible ? )

Delayed Start on a Haas ( Is this possible ? )