Fanuc 16i - change order of axis displayed in the left-side larger font display?
I've got X Z C Y A E & B axes, in that order, showing on the position display. However, E & B show in small font and won't show at all on most other screens.
A is the turret servo position, so it's pretty much useless to me. A is showing where I would much rather have E. I'd like to move E above A if possible.
I tried hiding A with the 3115 parameter, but that just puts a blank space where A was instead of moving E up to that position.
I also tried the 3130 and 3134 ordering parameters, but they did not seem to have any effect whatsoever.
Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?
16iA or B?
Can you edit the ladder? If you can try G198. It works like parameter 3115.
It should not require power down as I have used this for shutting off axis displays for C axis on lathes.
Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?
The new controls have parameter 13102 to close up a gap left from a non-displayed axis. I cant find an equivalent in the 16i.
Also, in re-reading parameter 3130 for the 16i it does appear to state that it is only valid for 2-path controls in a Fanuc kind of way. It also appears to only be valid for T controls.
The newer controls do not have those notes associated with 3130.