Fanuc 16i - change order of axis displayed in the left-side larger font display?


Results 1 to 8 of 8

Thread: Fanuc 16i - change order of axis displayed in the left-side larger font display?

  1. #1
    Member
    Join Date
    Nov 2007
    Location
    US
    Posts
    7
    Downloads
    0
    Uploads
    0

    Default Fanuc 16i - change order of axis displayed in the left-side larger font display?

    I've got X Z C Y A E & B axes, in that order, showing on the position display. However, E & B show in small font and won't show at all on most other screens.

    A is the turret servo position, so it's pretty much useless to me. A is showing where I would much rather have E. I'd like to move E above A if possible.

    I tried hiding A with the 3115 parameter, but that just puts a blank space where A was instead of moving E up to that position.

    I also tried the 3130 and 3134 ordering parameters, but they did not seem to have any effect whatsoever.

    Is there a way to do what I want here?

    Similar Threads:


  2. #2

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    Not sure why 3130 wouldn't work. Did you set all axis even if their order isnt being changed.
    X 1
    Z 2
    C 3
    Y 4
    A 7
    E 5
    B 6
    .



  3. #3
    Member
    Join Date
    Nov 2007
    Location
    US
    Posts
    7
    Downloads
    0
    Uploads
    0

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    Yeah, I tried that exact set. Does it take a power cycle? I tried a power cycle after changing 3130, but not 3134. I'll go try both again.

    Edit: Yup. I tried that sequence again, power cycled, no change. I tried that on 3134 as well, power cycled, no change.



  4. #4

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    16iA or B?
    Can you edit the ladder? If you can try G198. It works like parameter 3115.
    It should not require power down as I have used this for shutting off axis displays for C axis on lathes.

    And is 3115.1 = 0?



  5. #5
    Member
    Join Date
    Nov 2007
    Location
    US
    Posts
    7
    Downloads
    0
    Uploads
    0

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    It's 16i-TB. Yes, I can edit the ladder... or at least view it. I'm not sure I've actually tried to change anything yet.

    I'll take a look.

    Last edited by Darron Black; 10-15-2021 at 04:05 PM.


  6. #6
    Member
    Join Date
    Nov 2007
    Location
    US
    Posts
    7
    Downloads
    0
    Uploads
    0

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    Ok, so everything under 3115 is 0. If I change 3115.0 for A it just hides it, it doesn't shift E and B up at all.



  7. #7

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    The new controls have parameter 13102 to close up a gap left from a non-displayed axis. I cant find an equivalent in the 16i.
    Also, in re-reading parameter 3130 for the 16i it does appear to state that it is only valid for 2-path controls in a Fanuc kind of way. It also appears to only be valid for T controls.
    The newer controls do not have those notes associated with 3130.



  8. #8
    Member
    Join Date
    Nov 2007
    Location
    US
    Posts
    7
    Downloads
    0
    Uploads
    0

    Default Re: Fanuc 16i - change order of axis displayed in the left-side larger font display?

    Ah well. I may have to give up on this then. It is a T control, though. Weird prerequisites.

    Thanks anyway everyone!



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Fanuc 16i - change order of axis displayed in the left-side larger font display?

Fanuc 16i - change order of axis displayed in the left-side larger font display?