Evening all - Well Matt put in a good day today on Scoot-S3-01. He levelled and squared the base, installed the walls and the back board. I checked it out for rough level and square and it was acceptable. He struggled to get it right with the engineers level but was close enough for first fit. He's not used to working to small figures...The rail foundations are within rough spec so will be straightforward to get the rails right. The motion parts arrive this week so he'll be able to get up to the gantry stage very soon. The main thing now is to sort the electronics "drawer" so he is starting a breadboard with all the components. Next week he builds the drawer and we start wiring a mock up enclosure. Aim to get the motors turning on the bench asap... Gantry parts arrive in 2 weeks so then its all GO to the finish line... Peter