Drill the hole with all G1 moves rather than a drill cycle. That way you have 100% control over everything that happens and you can insert spindle and feed speed changes anywhere needed. Many times you can set this up in CAM and post it as a stand alone operation with ''use canned cycles'' turned off. Then just edit the G code and insert the drill operation where needed.