Need Help! G200 drilling with Q parameter in iso programming


Results 1 to 4 of 4

Thread: G200 drilling with Q parameter in iso programming

  1. #1
    Member
    Join Date
    Aug 2007
    Location
    PAKISTAN
    Posts
    224
    Downloads
    0
    Uploads
    0

    Default G200 drilling with Q parameter in iso programming

    This drilling cycle in iso programming format with G200 Q parameter..some my machine not accept this format even i change machine programming format from Heidenhain to iso..... when i transfer this program from pc to machine there is a error come on G200 line

    Similar Threads:
    Attached Thumbnails Attached Thumbnails G200 drilling with Q parameter in iso programming-img-20181015-wa0000-jpg  


  2. #2
    five7's Avatar
    Join Date
    Oct 2015
    Location
    Asdfgg
    Posts
    10
    Downloads
    0
    Uploads
    0

    Default

    It work in iso, but in certain format only.What controller? In tnc 430 N10 G200 Q200=2 Q201=-20 Q206=150 Q202=5
    Q210=0 Q203=+0 Q204=50 Q211=0 * You need to fill all the drilling parameters in the exact same sequence, even if the value is zero. I wasted a lot of time with G83, working very similar (sequence matters, and all parameters must be filled). Hdh drill cycles in iso really sucks. I ended up with CAM software emulated drill cycles, and it works surprisingly well



  3. #3
    Member
    Join Date
    Aug 2007
    Location
    PAKISTAN
    Posts
    224
    Downloads
    0
    Uploads
    0

    Default

    Quote Originally Posted by five7 View Post
    It work in iso, but in certain format only.What controller? In tnc 430 N10 G200 Q200=2 Q201=-20 Q206=150 Q202=5
    Q210=0 Q203=+0 Q204=50 Q211=0 * You need to fill all the drilling parameters in the exact same sequence, even if the value is zero. I wasted a lot of time with G83, working very similar (sequence matters, and all parameters must be filled). Hdh drill cycles in iso really sucks. I ended up with CAM software emulated drill cycles, and it works surprisingly well

    Thanks bro for response .my controller is tnc426 (nc software 480462 08...i already used this G200 cycle with iso code on tnc 430...i use creo cad cam software for design snd cam
    What is it mean (I ended up with CAM software emulated drill cycles, and it works surprisingly well)

    Regards
    Asif



  4. #4
    five7's Avatar
    Join Date
    Oct 2015
    Location
    Asdfgg
    Posts
    10
    Downloads
    0
    Uploads
    0

    Default

    It means, that my postprocessor give out the drilling cycle using only G0 and G1. I use Gpost. Regards



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

G200 drilling with Q parameter in iso programming

G200 drilling with Q parameter in iso programming