- Need Help!- Miyano BNA-42MSY G751 Code
-
Registered
Miyano BNA-42MSY G751 Code
I'm looking for the specific arguments for a G751 Re-grip cycle code for a Miyano BNA-42MSY w/Mitsubishi 70PLC-V control.
Or a method to pick a short part (.100 long) from the main spindle with the sub-spindle, pull to a specified length, re-grip, then position for cut-off with ~.650 sticking out of sub for back-side operations.
Thanks for any input.
Similar Threads:
-
- Need Help!- Miyano BNA-42MSY G751 Code
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules