I'm looking for the specific arguments for a G751 Re-grip cycle code for a Miyano BNA-42MSY w/Mitsubishi 70PLC-V control.

Or a method to pick a short part (.100 long) from the main spindle with the sub-spindle, pull to a specified length, re-grip, then position for cut-off with ~.650 sticking out of sub for back-side operations.

Thanks for any input.

Similar Threads: