- Star ECAS 20/32
-
Registered
Star ECAS 20/32
Anyone have programming examples of the polygon operation on the Siemens control ECAS 20?
Or if you know the G-command, I could figure it out from there. The Star operation manual doesn't have the G code listed for polygon.
thanks,
Dave
Similar Threads:
-
-
Registered
Hi I also need any document about ECAS20 maybe we can help each other
I don't have programming manuel bad point
gunaydinemre@hotmail.com
-
Activation process
Re: Star ECAS 20/32
CH1
;Star_Ecas_Metric 2022/8/24
;CH1 PROGRAM FOR Star_Ecas_20 POST PROCESSOR VERSION 138
Star0=7.0 ;BAR DIA
Star1=30.5 ;PART LENGTH
Star2=4249 ;CUTOFF RPM
Star3=3.0 ;CUTOFF WIDTH
Star4=165.5 ;ZERO POSITION
WCS120
TOPCUT
G0 G95
M131 ; (1)
;COLLET RECHUCK
TOP:
M5
MS1
G97 M3 S500
M11
G0 Z9.5
M25
waitm(900,1,2,3)
M20
M10
G28 X0.0
waitm(902,1,2,3)
M131 ;Z Path 1 on (2)
msg("N1 Face Off")
;N1 Face Off
T202 ;OD Turn-GANG
JP11
N1
EJP11:
MS1
G97 S6536 M3
G95 G0 Y0.0 Z0. T2
X8.4
G18
G1 X6.4 F0.177
X-0.6
X-2.6
M1
msg("N14 Front Turn")
;N14 Front Turn
MS1
G97 S6991
G0 Z-0.761
X-0.573
G1 X1.124 Z0.088 F0.062
X1.324 Z0.188
G2 X1.5 Z0.4 CR=0.3
G1 Z6.076
X2.324 Z6.488
G2 X2.5 Z6.7 CR=0.3
G1 Z12.43
X6.4
X7.814 Z13.137
G28 X0.0
M1
msg("N3 Threading")
;N3 Threading
T403 ;Threading
JP12
N2
EJP12:
MS1
G97 S3879 M3
G95 G0 Y0.0 Z4.4 T3
X6.5
G18
G291
G76 P011060 Q013 R000
G76 X1.948 Z11.5 P276 Q100 F0.45
G0
G290
G28 X0.0
M1
msg("N13 Finish Turn")
;N13 Finish Turn
T202 ;OD Turn-GANG
JP13
N3
EJP13:
MS1
G97 S7340 M3
G95 G0 Y0.0 Z10.951 T2
X4.197
G18
G1 X2.5 Z11.8 F0.062
Z19.127
X5.7 Z20.051
G2 X6.0 Z20.31 CR=0.3
G1 Z30.8
X7.414 Z31.507
G28 X0.0
M1
msg("N5 Back Turn")
;N5 Back Turn
T303 ;Back Turning
JP14
N4
EJP14:
MS1
G97 S4780 M3
G95 G0 Y0.0 Z25.5 T3
X8.0
G18
G1 X6.0 F0.036
X5.0
Z28.0
X3.695
Z30.5
X7.295
G28 X0.0
M1
waitm(904,1,3)
M133 ;Z Path 3 on (3)
;PART EJECTION
waitm(906,1,2,3)
M133 ;Z Path 3 on (4)
;SUPPORT PART
T100
G28 X0.0
M131 ; (5)
M141 ;Z1-Z2 SYNC OFF
waitm(910,1,2)
M26
M80
BAREND
EM80:
MS1
M5
M99
M30
CH2
;Star_Ecas_Metric 2022/8/24
;CH2 PROGRAM FOR Star_Ecas_20 POST PROCESSOR VERSION 138
WCS130
T2000
G0 G95
;COLLET RECHUCK
TOP:
waitm(900,1,2,3)
M20
M25
waitm(902,1,2,3)
msg("N8 Face Off - Sub")
;N8 Face Off - Sub
M75
T4141 ;OD Turn-Sub
WCS132
JP26
N6
EJP26:
MS2
G97 S7045 M3
G95 G0 X8.15 T41
Z0.
M1
X8.15
G1 X6.15 F0.1771
X-0.7
Z-1.0
M1
msg("N9 Turn Out - Sub")
;N9 Turn Out - Sub
MS2
G97 S8000
G0 Z-0.6778
X2.0272
G1 X3.4414 Z0.0293
X3.6414 Z0.1293
X5.0556 Z-0.5778
G28 Z0
EM75:
M1
msg("N10 Tap 1.6")
;N10 Tap 1.6
T4242 ;Spot Drill-Sub
WCS132
JP27
N7
EJP27:
MS2
G97 S1925 M3
G95 G0 X0. T42
Z-1.0
M1
G291
G83 Z1.05 F0.0254
G80
G290
G0 Z-1.0
G28 Z0
EM75:
M1
msg("N11 Tap 1.6")
;N11 Tap 1.6
T4343 ;Drill Carb-1.3-SUB
WCS132
JP28
N8
EJP28:
MS2
G97 S8000 M3
G95 G0 X0. T43
Z-1.0
M1
G291
G83 Z6.6906 Q50000 F0.033
G80
G290
G0 Z-1.0
G28 Z0
EM75:
M1
msg("N12 Tap 1.6")
;N12 Tap 1.6
T4444 ;Tap_.35_SUB
WCS132
JP29
N9
EJP29:
MS2
G97 S5971 M3
G95 G0 X0. T44
Z-1.0
M1
G291
G84 Z5.3 P1000 F0.35
G80
G290
G0 Z-1.0
G28 Z0
EM75:
M1
;PART EJECTION
msg("PART EJECTION")
M75
T2900
WCS130
M75
MS2
M5
M14
G0 Z0.
M11
G4 F1.0
M27;CUTOFF DETECT
M84
T0
EM75:
G28 Z0
M15
T2000
waitm(906,1,2,3)
;SUPPORT PART
T2000
waitm(908,2,3)
G28 Z0
MS2
G97 S4249 M4
M82;SPIN SYNC ON
M11;SUB OPEN
G4 X.5
WCS131 (12.7)
G0 Z-2.
M68 ;SPINDLE TORQUE DOWN
G94 G1 Z25.0 F50.0
G95 M10 ;SUB CLOSE
M69 ;SPIN TORQUE NORMAL
G4 X.5
WCS132
M140 ;Z1-Z2 SYNCH ON
M141 ;Z1-Z2 SYNC OFF
M68 ;SPINDLE TORQUE DOWN
G0 Z=IC(-40.0)
M69
M83 ;SPIN SYNC OFF
WCS130
MS2
G28 Z0 M5
waitm(910,1,2)
M99
M30
CH3
;Star_Ecas_Metric 2022/8/24
;CH3 PROGRAM FOR Star_Ecas_20 POST PROCESSOR VERSION 138
G28 Z0
G28 X0.0
T1100
G0 G95
M131 ; (1)
;COLLET RECHUCK
TOP:
waitm(900,1,2,3)
M20
WCS140
waitm(902,1,2,3)
M131 ;Z Path 1 on (2)
waitm(904,1,3)
M133 ;Z Path 3 on (3)
msg("N7 MILLFLATS")
;N7 MILLFLATS
MS1
M5
G97
spos[1]=0
waits(1)
T1408 ;End Mill_4
JP35
N5
EJP35:
MS13
M3 S3762
G94 G0 Y-6.5 Z29.94 T14
M7 ;SPINDLE RELEASE
spos[1]=180.0
M6 ;SPINDLE CLAMP
X3.2
G1 Y6.5 F170.0
M7 ;SPINDLE RELEASE
spos[1]=120.0
M6 ;SPINDLE CLAMP
G1 Y-6.5
M7 ;SPINDLE RELEASE
spos[1]=60.0
M6 ;SPINDLE CLAMP
G1 Y6.5
M7 ;SPINDLE RELEASE
spos[1]=0.
M6 ;SPINDLE CLAMP
G1 Y-6.5
M7 ;SPINDLE RELEASE
spos[1]=300.0
M6 ;SPINDLE CLAMP
G1 Y6.5
M7 ;SPINDLE RELEASE
spos[1]=240.0
M6 ;SPINDLE CLAMP
G1 Y-6.5
M17
G28 X0.0
MS13
M5
M7 ;SPINDLE RELEASE
M1
N8 ;Face Off - Sub
N10 ;Tap 1.6
N11 ;Tap 1.6
N12 ;Tap 1.6
waitm(906,1,2,3)
M133 ;Z Path 3 on (4)
msg("N6 Cut Off")
;N6 Cut Off
T1111 ;Cut-off
JP31
N1
EJP31:
;SUPPORT PART
waitm(908,2,3)
MS1
G97 S4249 M3
G0 Z30.5
M82;SPIN SYNC ON
M140 ;Z1-Z2 SYNCH ON
G95 G0 Z30.5 T11
X9.0
G18
G1 X7.0 F0.053
X0.
Z31.0
M131 ; (5)
M83 ;SPIN SYNC OFF
M1
M99
M30
-
Activation process
Re: Star ECAS 20/32
I am now experiencing file transfer to machine?
my mail xzaiqi@gmail.com
- Star ECAS 20/32
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules