'95 model E2 25J.

Are there any canned cycles on these controls? Specifically for turning/boring and peck drilling. My manual does not list any canned cycles but surely there are a few that can be utilized. I hate line by line programming with a passion. Especially when you need to make a minor change and it takes 15 minutes of modifying code to make one tiny adjustment.

If so can someone please post an example of the codes and explanation? I can find nothing on the net about this. Would be much appreciated.

Similar Threads: