Bridgeport Interact 412 Tool Changer Z position adjustment


Results 1 to 3 of 3

Thread: Bridgeport Interact 412 Tool Changer Z position adjustment

  1. #1
    Kevv3212's Avatar
    Join Date
    Nov 2022
    Posts
    0
    Downloads
    0
    Uploads
    0

    Default Bridgeport Interact 412 Tool Changer Z position adjustment

    Hi!

    I would need help with determining the tool changer Z position parameter number, can't find any PLC position parameter descriptions. I have read that it should be a parameter.

    Our machine uses TNC 151 control.

    Thanks!

    Similar Threads:


  2. #2
    Member RMARCH's Avatar
    Join Date
    Sep 2005
    Location
    USA
    Posts
    249
    Downloads
    0
    Uploads
    0

    Default Re: Bridgeport Interact 412 Tool Changer Z position adjustment

    The tool changer parameter number should be MP126, mine is set around 68mm



  3. #3
    Member RMARCH's Avatar
    Join Date
    Sep 2005
    Location
    USA
    Posts
    249
    Downloads
    0
    Uploads
    0

    Default Re: Bridgeport Interact 412 Tool Changer Z position adjustment

    Here is the TNC151 service manual

    Attached Files Attached Files


Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Bridgeport Interact 412 Tool Changer Z position adjustment

Bridgeport Interact 412 Tool Changer Z position adjustment