I recently purchased a Tore-Cut 22 at auction. Prior to getting it delivered, I want to build some machine skates so I can move it around the shop during it's refurbishment. Can anyone provide the dimensions of the leveling feet /bolts. Pictures are always welcome
So I got the machine into the shop and I have single phase power hooked up to it. I haven’t moved any of the axis, just wanted to see the controller boot up. Before I move anything, I need to get the tool carousel moved to the home position. It seems it was powered down (prior to me getting it) with the carousel in the change position. What is the best way to get everything sequenced correctly?
Quick update, I was able to get all the axis and tool changer homed. I'm in the process of cleanup and paint refresh. So far, I've removed two 5 gallon buckets of chips. The enclosure was removed for media blasting, I'll get primer on all the metal parts this week.