Finished up the motor side pulley today. The second pulley went much faster than the first... The UPS man is supposed to be bringing me the correct length belt tomorrow so progress can continue. Up next will be the belt tensioner arrangement and making some clearance for the belt (its a little to close as is).
(Plans fresh from the engineering department....)
(Blank chucked up ready to machine)
(A quick time lapse of drilling the 3 holes that bolt the pulley to the motor flange)
(a few photos showing the pulley mounted to the motor.... "ready for action")
(a "cut away" showing the belt drive in its current state)
Thanks!!!