It's been a long time since my last update. Well I was able to finally get a water cooled spindle for my machine. I thought that the spindle will be plug and play but I was mistaken. It has to be hard wired so being that I rent that option is not available to me. I will start to work on a water cooling enclosure for the spindle, which I will like to place on the rack under the cutting table. I will be using some 20 series 80/20 that I had bought by mistake and now I will finally be able to use it for some thing. Most other people usually place radiator and pump on or next to the spindle. I don't want the added weight on the gantry plus I don't really like the way it looks on there. I have a rough idea on the way I want the box for the cooling enclosure to look. Now that I have everything needed to run the machine, I will like to start working on it more often and posting progress on here. I'm so excited that I have got this far already
. Once I finally finish my machine all I will need will be to get an electrician, to figure out how to get power to the machine without having to hard wire to electrical panel. Until then I will be working on other parts in the mean time. If anyone have any questions or comments I will like to hear from you.