CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking > Welding, Brazing, Soldering, Sealing


Welding, Brazing, Soldering, Sealing Discuss Welding, Brazing, Soldering, Sealing technique's here.


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 03-29-2006, 04:04 PM
 
Join Date: Oct 2003
Location: USA
Age: 36
Posts: 491
Edster is on a distinguished road
Annealing steel parts after welding?

I make parts for actuators that are made from tube that I cut a shoulder on and cut to length. I press stamped washers on the shoulder then I weld the washers on to the tube. I have to bore out the tube to .7575 +/- .0025. It seems like the parts are getting hardened slightly near the welds and It's affecting my dimensions. The part is perfect except it's a few thou smaller on the very end near the weld. The tube is 1018 DOM and the steel is cold roll. I'm tig welding these with no filler metal, just fusing them together. I'd like to anneal them somehow, but I don't know anything about annealing. I used to swage these parts together with a BFH, but sometimes the parts would come apart in the cnc. Welding seems like the way to go. I have a few thousand of these to make a month and I need to figure out how hot to go for how long and how long to cool. Any help would be appreciated.
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 03-29-2006, 04:22 PM
Bowman's Avatar  
Join Date: Sep 2004
Location: USA
Posts: 214
Bowman is on a distinguished road

Hmmm. No welding expert here but I have been down the street. Do you think the issue could be because you aren't using a filler material to join the washer to the tube? I would think that using the push the puddle technique and using the material from the pieces your trying to weld together as the filler may be causing lose of material in one spot as it flows to another spot. Are you welding this around the external seem or internal or both? Give it a try using some filler materiel and then just turn/bore down the excess to the desired dimension and see if that works. To anneal heat till red hot and quick quench in water that should re-align the atoms and make it softer to work with. Like I said I am no expert on this subject but I did stay in a Holiday Inn last night.. ohh and took a few classes on this way back when in college...

Hope you work it out.

Bowman
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 03-29-2006, 04:27 PM
 
Join Date: Jul 2005
Location: Canada
Posts: 11,419
Geof will become famous soon enough

Possibly what you should be considering is stress relieving not annealing. This is done at a lower temperature so it does not affect the properties of the steel as much. If you did anneal DOM you might find it difficult to get a good machined surface because the machining properties are not as good as in the work hardened state. One thing I suggest you try is preheating the piece before welding; the effect you are getting is largely due to the metal being heated in a small area which is then chilled rapidly by the surrounding material as the weld moves on. You should not need much preheat to reduce the chilling effect.
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 03-29-2006, 04:37 PM
Bowman's Avatar  
Join Date: Sep 2004
Location: USA
Posts: 214
Bowman is on a distinguished road

True Geof.. Pre-heating is always a good practice.. And I should have mentioned that a full anneal will make the metal much softer until its either work hardened or heat treated. Stress relieving is also a good option but I am not sure what type of constant temperature levels you may have to maintain or time lengths you might be looking at. It all depends on the metal and thickness etc.

I remember my first demo of annealing when we took a basturd file and annealed it till it was easy to bend, then heat treated it back to full hardness to the point it would shatter if you tried to bend it back. Ahhhh metal is wacky weird wild stuff lol..
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 03-29-2006, 04:47 PM
 
Join Date: Apr 2003
Location: USA ofallon, Mo
Posts: 348
motomitch1 is on a distinguished road

The parts are heated and held at the austenitic temperature for one-half to one hour per inch of thickness to allow the part to stabilize throughout as austenite. The steel is then cooled very slowly.
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 03-29-2006, 05:10 PM
 
Join Date: Oct 2003
Location: USA
Age: 36
Posts: 491
Edster is on a distinguished road

I just tried heating the parts with a rosebud till the were barley red hot and letting them cool to room temp naturally. It seems to work good. The finish is good, and it doesn't sound like a helicopter when i bore through that area like it use to. The size is also good. The parts need to be plated after machining and I'm not sure if using o/a will affect that. I really would like a small oven to do this in. Which get's me back to, how hot do I need to get these parts. I saw a small electric oven that went to around 1000 deg f, but I don't want to get it to find out it won't go hot enough. I'm definitly willing to experiment with time and temp etc. I just don't want to buy the wrong oven.
Tweet this Post!Share on Facebook
Reply With Quote

  #7   Ban this user!
Old 03-29-2006, 05:21 PM
 
Join Date: Feb 2006
Location: USA
Posts: 313
WhiteTiger is on a distinguished road

Annealing range for 1018 is 1575-1650 F. Time at temp 1/2 hr for small section (13 mm or less), 1 hr for 25mm section.

Recommended furnace cooling rate of 50F/hr over range from 1575 to 1300 for HB 111-149.

(from metals handbook)


Tiger
Tweet this Post!Share on Facebook
Reply With Quote

  #8   Ban this user!
Old 03-29-2006, 09:10 PM
 
Join Date: Dec 2005
Location: USA
Posts: 3,319
NC Cams is on a distinguished road

To add to Tiger's input:

After you weld, you can do high temp stress relieve at 1250 for 1-1.5 hr per inch of material thickness, 1 hour min as opposed to a true anneal. Furnace cool if possible.

After we weld low carbon steel (under 0.25 carbon) we usually normalize which helps "homogonize" the material. Anneal then normalize is called "double draw" and is REAL good to do if you'll carburize or do some other H/T later. Helps keep stuff from moving around.

We find that stuff stays REAL stable (distortion free) after doing the high temp stress relieve mentioned above...
Tweet this Post!Share on Facebook
Reply With Quote

  #9   Ban this user!
Old 03-30-2006, 02:30 PM
 
Join Date: Oct 2003
Location: USA
Age: 36
Posts: 491
Edster is on a distinguished road

I bought a small oven and I've got some experimenting to do.
Thanks for all the help!
Tweet this Post!Share on Facebook
Reply With Quote

  #10   Ban this user!
Old 03-31-2006, 04:38 PM
 
Join Date: Oct 2003
Location: USA
Age: 36
Posts: 491
Edster is on a distinguished road

600F for 1 hour is working pretty good.

Here are a few pics if anyone is interested.

http://www.ewwenterpriseinc.com/images/DSCF0001.JPG

http://www.ewwenterpriseinc.com/images/DSCF0002.JPG

http://www.ewwenterpriseinc.com/images/DSCF0003.JPG

http://www.ewwenterpriseinc.com/images/DSCF0004.JPG
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On





All times are GMT -5. The time now is 04:41 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353