    Mass production turning of a part. Material is 1.0" diameter 12L14 bar stock. The original part was made of S7 tool steel, but required coolant. The machine is a Mori Seiki NL2500SY-700 CNC Turning Center with a Y-axis, C-axis on both spindles, live tooling, and a subspindle.

    Better quality version available at: our website.

    Also available on Youtube.

    "http://www.youtube.com/watch?v=MwgobIVj4fU"]YouTube - Mass Production Turning - Mori Seiki CNC Lathe


  2. #2
    Registered
    Join Date
    Jan 2008
    Location
    Beaverdam, Virginia USA
    Posts
    396
    Downloads
    0
    Uploads
    0
    I fail to see what is so impressive, doesn't look all that fast for that material.


  3. #3
    Registered
    Join Date
    Jul 2005
    Location
    Canada
    Posts
    11,961
    Downloads
    0
    Uploads
    0
    I sometimes wonder about the economics of that kind of single machine manufacturing. What is the cost of that machine, what is its per minute charge out rate? That part was not particularly complex and could be done in three operations; one lathe and two on a mill in pretty close to the same total time of around four minutes, with the correct fixturing. How was this part made before that dual spindle life tooling machine was available?
    An open mind is a virtue...so long as all the common sense has not leaked out.


  4. #4
    Registered
    Join Date
    Jul 2004
    Location
    Canada
    Posts
    601
    Downloads
    0
    Uploads
    0
    Geof,

    For simple parts the payoff isn't there. If you remember the parts I picked your brain on a little over a year ago (pump heads) you know they are a fairly simple part. I had my cousin do a run of them for me on his Mazak Integrex. I'm currently getting all of my fixtures built for my mill to finish off my lathe blanks. It's looking like the total machine time will be very close to the same, the difference being I will have 2 spindles running. The mill/lathe programs aren't quite the same (time wise) so I will probably run at 2/3 the time as the Integrex. The subspindle live tooled lathe would be a little faster than the Integrex due to faster tool changes.

    So my take on this is most 2-4 op parts can be done faster (in quantity) on dedicated machines than on combo machines. The beauty of the turn mill machines is the setup time is way less than on a mill (fixture plates) because most of them hold 40+ tools. They are nicer than a lathe because you get away from most tool interference problems (at the expense of longer tool changes). I feel once you get into 5+ ops or a true turn/5axis part, a combo machine will come out on top.

    Now the cost factor also comes in. I'm going from memory on the pricing here so don't flame me too badly. A live tooled subspindle lathe with y axis from Mori (8 and 6" chuck) was about 230 000usd, and the Doosan was about 160 000. The Hyundai was in between and DMG was up there with Mori. To get a tooled up mill turn machine you are looking at 400 000+. These prices are from about a year ago, and I bet they have dropped off a bit.

    The things I don't like about the live tooled lathes are: tool interference, limited tool pockets, (which becomes a bigger problem with live tools and a sub), very limited y axis (most machines only have 3-4"), and limited power on the live tools. The mill turn machines get away from most of these short comings, but unless you are doing high dollar aerospace, or medical work (or some other high dollar niche) you are working to pay for the machine, and not making anything for yourself.

    Now you could go out and buy 2 Haas SL-20s and a VF-2 with a 4th for less than the Mori live tooled subspindle lathe and have very close to 3 times the production, with more capabilities. For a little bit more than the cost of the Mori you could add a robot to the mix and really go to town.

    I hope you can make some sense out of this long winded post.
    On all equipment there are 2 levers...
    Lever "A", and Lever F'in "B"


  • #5
    Registered
    Join Date
    Jul 2004
    Location
    Canada
    Posts
    601
    Downloads
    0
    Uploads
    0
    BTW that is a nice video, but do you have any videos of parts that actually need y-axis?
    On all equipment there are 2 levers...
    Lever "A", and Lever F'in "B"


  • #6
    Registered
    Join Date
    May 2005
    Location
    USA
    Posts
    674
    Downloads
    0
    Uploads
    0
    Quote Originally Posted by Geof View Post
    I sometimes wonder about the economics of that kind of single machine manufacturing. What is the cost of that machine, what is its per minute charge out rate? That part was not particularly complex and could be done in three operations; one lathe and two on a mill in pretty close to the same total time of around four minutes, with the correct fixturing. How was this part made before that dual spindle life tooling machine was available?
    If the tools hold up, a barfed subspindle/live tooled lathe can run unmanned for a long time, and the job could be setup with minimal investment, just the soft jaws.

    I guess it boils down to paying for labor vs. paying for the machine.


  • #7
    Registered
    Join Date
    Jul 2005
    Location
    Canada
    Posts
    11,961
    Downloads
    0
    Uploads
    0
    If the tools hold up, a barfed subspindle/live tooled lathe can run unmanned for a long time, and the job could be setup with minimal investment, just the soft jaws.


    Now you could go out and buy 2 Haas SL-20s and a VF-2 with a 4th for less than the Mori live tooled subspindle lathe and have very close to 3 times the production, with more capabilities.

    I guess it boils down to paying for labor vs. paying for the machine.

    I am not sure I agree with the first comment above about "minimal investment"; the machine the soft jaws bolt into is not cheap.

    The other two quotes more or less describe my conclusions. You always have to pay at least some labor costs so that can be a wash. If you are guaranteed you will never have to run simple parts the fancy multi-spindle machine may be the one to have, but if you do a mix of parts you may be better off having two or three less complicated machines for the same initial cost.
    An open mind is a virtue...so long as all the common sense has not leaked out.


  • #8
    Registered
    Join Date
    Jul 2004
    Location
    Canada
    Posts
    601
    Downloads
    0
    Uploads
    0
    For short run parts in a job shop environment it is tough to beat a multi axis machine, even for simple, multi op parts.
    On all equipment there are 2 levers...
    Lever "A", and Lever F'in "B"


  • #9
    Gold Member dertsap's Avatar
    Join Date
    Oct 2005
    Location
    canada
    Posts
    3,879
    Downloads
    0
    Uploads
    0
    with doing multiple operations there more handling of the parts , more room for loading errors , more power consumption and more space taken up to accomplish the same thing , there is more fixturing , more setup time , more labor . with the right jobs on that machine it can be run lights out and even pushed to the extent that it can be monitored from home so someone can spend a few hrs over a weekend and be pumping bars and changing a few tools .
    the one machine can be replaced with 3 haas machines but that is the case if you buy a mori mill as well , mori's are far greater quality and performance machines and will last an extremely long time which can justify the costs as long as the company has an assortment of other machines to cover other types of work
    I think a twin spindle should be accompanied by a twin turret , that way one spindle doesn't sit idle
    I worked with a nakamura twin turret twin spindle with live tooling and a bar stacker , with the few jobs that were designated for the machine it was paid off within the first year of the company owning it , its been over 10 yrs and that machine is still running strong , so with the right jobs and the right setup then it can easily be justified
    A poet knows no boundary yet he is bound to the boundaries of ones own mind !! ........
    http://microcarve.microcarve.biz/


  • #10
    Registered littlerob's Avatar
    Join Date
    Jan 2008
    Location
    usa
    Posts
    570
    Downloads
    0
    Uploads
    0
    I just think if you are going to post a video in a thread titled "mass production turning" It should be an impressive video- not that. I push the 1971 Graziano harder than that.


  • #11
    Registered
    Join Date
    Jan 2008
    Location
    Beaverdam, Virginia USA
    Posts
    396
    Downloads
    0
    Uploads
    0
    Quote Originally Posted by littlerob View Post
    I just think if you are going to post a video in a thread titled "mass production turning" It should be an impressive video- not that. I push the 1971 Graziano harder than that.
    Glad to see I am not the only one not impressed.


  • #12
    Registered
    Join Date
    Aug 2009
    Location
    USA
    Posts
    9
    Downloads
    0
    Uploads
    0
    Quote Originally Posted by littlerob View Post
    I just think if you are going to post a video in a thread titled "mass production turning" It should be an impressive video- not that. I push the 1971 Graziano harder than that.
    I think the video does a good job demonstrating continuous production in a 3-axis, dual spindle lathe to guys like me who have only used 2-axis lathes. The turning feeds and speeds do seem conservative, but perhaps good enough for long periods of unattended cycles.

    Nevermind the great camera angles and the video/music sync... all you guys seem to care about is taking the heaviest cuts possible.

    Extenze anyone?


  • Page 1 of 2 12 LastLast

    Similar Threads

    1. Need Help!- Configuring for mass production
      By sonnybiker in forum General Metalwork Discussion
      Replies: 14
      Last Post: 04-13-2011, 03:19 PM
    2. Need Help!- Mori Seiki Lathe Sl 3A
      By rajuicnc in forum Mori lathes
      Replies: 25
      Last Post: 09-27-2010, 07:37 AM
    3. Replies: 0
      Last Post: 07-29-2009, 06:23 AM
    4. Cam for an old Mori Seiki lathe
      By Bob Shaw in forum General CAM Discussion
      Replies: 1
      Last Post: 02-28-2009, 12:49 PM
    5. Mori-seiki/ Fanuc 11T Turning
      By B_Bueno in forum G-Code Programing
      Replies: 4
      Last Post: 11-10-2006, 10:33 PM

    Posting Permissions


     


    About CNCzone.com

      We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

    Follow us on

    Facebook Dribbble RSS Feed


    Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.