CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > Events, Product Announcements and More > Videos


Videos Post your video links here.



Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1  
Old 07-29-2009, 06:29 AM
*Registered User*
 
Join Date: Aug 2007
Location: United States
Posts: 147
Glacern is on a distinguished road
Talking Mass Production Turning on a Mori Seiki CNC Lathe

www.glacern.com

Mass production turning of a part. Material is 1.0" diameter 12L14 bar stock. The original part was made of S7 tool steel, but required coolant. The machine is a Mori Seiki NL2500SY-700 CNC Turning Center with a Y-axis, C-axis on both spindles, live tooling, and a subspindle.

Better quality version available at: our website.

Also available on Youtube.

Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 08-02-2009, 11:24 PM
 
Join Date: Jan 2008
Location: Riverside Ca. USA
Posts: 341
Dualkit is on a distinguished road
I fail to see what is so impressive, doesn't look all that fast for that material.
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 08-02-2009, 11:45 PM
 
Join Date: Jul 2005
Location: Canada
Posts: 11,419
Geof will become famous soon enough
I sometimes wonder about the economics of that kind of single machine manufacturing. What is the cost of that machine, what is its per minute charge out rate? That part was not particularly complex and could be done in three operations; one lathe and two on a mill in pretty close to the same total time of around four minutes, with the correct fixturing. How was this part made before that dual spindle life tooling machine was available?
__________________
An open mind is a virtue...so long as all the common sense has not leaked out.
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 08-03-2009, 02:17 AM
 
Join Date: Jul 2004
Location: Canada
Posts: 601
DSL PWR is on a distinguished road
Geof,

For simple parts the payoff isn't there. If you remember the parts I picked your brain on a little over a year ago (pump heads) you know they are a fairly simple part. I had my cousin do a run of them for me on his Mazak Integrex. I'm currently getting all of my fixtures built for my mill to finish off my lathe blanks. It's looking like the total machine time will be very close to the same, the difference being I will have 2 spindles running. The mill/lathe programs aren't quite the same (time wise) so I will probably run at 2/3 the time as the Integrex. The subspindle live tooled lathe would be a little faster than the Integrex due to faster tool changes.

So my take on this is most 2-4 op parts can be done faster (in quantity) on dedicated machines than on combo machines. The beauty of the turn mill machines is the setup time is way less than on a mill (fixture plates) because most of them hold 40+ tools. They are nicer than a lathe because you get away from most tool interference problems (at the expense of longer tool changes). I feel once you get into 5+ ops or a true turn/5axis part, a combo machine will come out on top.

Now the cost factor also comes in. I'm going from memory on the pricing here so don't flame me too badly. A live tooled subspindle lathe with y axis from Mori (8 and 6" chuck) was about 230 000usd, and the Doosan was about 160 000. The Hyundai was in between and DMG was up there with Mori. To get a tooled up mill turn machine you are looking at 400 000+. These prices are from about a year ago, and I bet they have dropped off a bit.

The things I don't like about the live tooled lathes are: tool interference, limited tool pockets, (which becomes a bigger problem with live tools and a sub), very limited y axis (most machines only have 3-4"), and limited power on the live tools. The mill turn machines get away from most of these short comings, but unless you are doing high dollar aerospace, or medical work (or some other high dollar niche) you are working to pay for the machine, and not making anything for yourself.

Now you could go out and buy 2 Haas SL-20s and a VF-2 with a 4th for less than the Mori live tooled subspindle lathe and have very close to 3 times the production, with more capabilities. For a little bit more than the cost of the Mori you could add a robot to the mix and really go to town.

I hope you can make some sense out of this long winded post.
__________________
On all equipment there are 2 levers...
Lever "A", and Lever F'in "B"
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 08-03-2009, 02:25 AM
 
Join Date: Jul 2004
Location: Canada
Posts: 601
DSL PWR is on a distinguished road
BTW that is a nice video, but do you have any videos of parts that actually need y-axis?
__________________
On all equipment there are 2 levers...
Lever "A", and Lever F'in "B"
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 08-03-2009, 08:43 AM
 
Join Date: May 2005
Location: USA
Posts: 673
Zumba is on a distinguished road
Originally Posted by Geof View Post
I sometimes wonder about the economics of that kind of single machine manufacturing. What is the cost of that machine, what is its per minute charge out rate? That part was not particularly complex and could be done in three operations; one lathe and two on a mill in pretty close to the same total time of around four minutes, with the correct fixturing. How was this part made before that dual spindle life tooling machine was available?
If the tools hold up, a barfed subspindle/live tooled lathe can run unmanned for a long time, and the job could be setup with minimal investment, just the soft jaws.

I guess it boils down to paying for labor vs. paying for the machine.
Tweet this Post!Share on Facebook
Reply With Quote

  #7   Ban this user!
Old 08-03-2009, 10:52 AM
 
Join Date: Jul 2005
Location: Canada
Posts: 11,419
Geof will become famous soon enough
If the tools hold up, a barfed subspindle/live tooled lathe can run unmanned for a long time, and the job could be setup with minimal investment, just the soft jaws.


Now you could go out and buy 2 Haas SL-20s and a VF-2 with a 4th for less than the Mori live tooled subspindle lathe and have very close to 3 times the production, with more capabilities.

I guess it boils down to paying for labor vs. paying for the machine.

I am not sure I agree with the first comment above about "minimal investment"; the machine the soft jaws bolt into is not cheap.

The other two quotes more or less describe my conclusions. You always have to pay at least some labor costs so that can be a wash. If you are guaranteed you will never have to run simple parts the fancy multi-spindle machine may be the one to have, but if you do a mix of parts you may be better off having two or three less complicated machines for the same initial cost.
__________________
An open mind is a virtue...so long as all the common sense has not leaked out.
Tweet this Post!Share on Facebook
Reply With Quote

  #8   Ban this user!
Old 08-03-2009, 01:09 PM
 
Join Date: Jul 2004
Location: Canada
Posts: 601
DSL PWR is on a distinguished road
For short run parts in a job shop environment it is tough to beat a multi axis machine, even for simple, multi op parts.
__________________
On all equipment there are 2 levers...
Lever "A", and Lever F'in "B"
Tweet this Post!Share on Facebook
Reply With Quote

  #9  
Old 08-03-2009, 01:59 PM
dertsap's Avatar
Gold Member
 
Join Date: Oct 2005
Location: canada
Posts: 3,608
dertsap is on a distinguished road
Buy me a Beer?
with doing multiple operations there more handling of the parts , more room for loading errors , more power consumption and more space taken up to accomplish the same thing , there is more fixturing , more setup time , more labor . with the right jobs on that machine it can be run lights out and even pushed to the extent that it can be monitored from home so someone can spend a few hrs over a weekend and be pumping bars and changing a few tools .
the one machine can be replaced with 3 haas machines but that is the case if you buy a mori mill as well , mori's are far greater quality and performance machines and will last an extremely long time which can justify the costs as long as the company has an assortment of other machines to cover other types of work
I think a twin spindle should be accompanied by a twin turret , that way one spindle doesn't sit idle
I worked with a nakamura twin turret twin spindle with live tooling and a bar stacker , with the few jobs that were designated for the machine it was paid off within the first year of the company owning it , its been over 10 yrs and that machine is still running strong , so with the right jobs and the right setup then it can easily be justified
__________________
A poet knows no boundary yet he is bound to the boundaries of ones own mind !! http://cnctoybox.org
Tweet this Post!Share on Facebook
Reply With Quote

  #10   Ban this user!
Old 08-06-2009, 06:37 PM
littlerob's Avatar  
Join Date: Jan 2008
Location: usa
Age: 34
Posts: 555
littlerob is on a distinguished road
I just think if you are going to post a video in a thread titled "mass production turning" It should be an impressive video- not that. I push the 1971 Graziano harder than that.
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #11   Ban this user!
Old 08-06-2009, 07:03 PM
 
Join Date: Jan 2008
Location: Riverside Ca. USA
Posts: 341
Dualkit is on a distinguished road
Originally Posted by littlerob View Post
I just think if you are going to post a video in a thread titled "mass production turning" It should be an impressive video- not that. I push the 1971 Graziano harder than that.
Glad to see I am not the only one not impressed.
Tweet this Post!Share on Facebook
Reply With Quote

  #12   Ban this user!
Old 08-09-2009, 09:55 PM
 
Join Date: Aug 2009
Location: USA
Age: 45
Posts: 9
Trent Steel is on a distinguished road
Originally Posted by littlerob View Post
I just think if you are going to post a video in a thread titled "mass production turning" It should be an impressive video- not that. I push the 1971 Graziano harder than that.
I think the video does a good job demonstrating continuous production in a 3-axis, dual spindle lathe to guys like me who have only used 2-axis lathes. The turning feeds and speeds do seem conservative, but perhaps good enough for long periods of unattended cycles.

Nevermind the great camera angles and the video/music sync... all you guys seem to care about is taking the heaviest cuts possible.

Extenze anyone?
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need Help!- Configuring for mass production sonnybiker General Metalwork Discussion 14 04-13-2011 03:19 PM
Need Help!- Mori Seiki Lathe Sl 3A rajuicnc Mori lathes 25 09-27-2010 07:37 AM
Turning a Chess Rook on a Mori Seiki Y-axis Lathe Glacern Videos 0 07-29-2009 06:23 AM
Cam for an old Mori Seiki lathe Bob Shaw General CAM Discussion 1 02-28-2009 12:49 PM
Mori-seiki/ Fanuc 11T Turning B_Bueno G-Code Programing 4 11-10-2006 10:33 PM




All times are GMT -5. The time now is 08:03 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353