CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking Machines > General Metal Working Machines > Vertical Mill, Lathe Project Log


Vertical Mill, Lathe Project Log Post your project building or converting logs here for lathes or milling machines.


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 05-23-2008, 11:44 PM
 
Join Date: Apr 2005
Location: us
Age: 37
Posts: 98
antichip is on a distinguished road
It is about time I get this mill started

Well I am about ready to start ordering materials for my self built mill.
It will have a working envelope of the 3X2 foot table with a 2.5 foot z travel. I may have to add a little to this before it is all said and done. Main frame will be 6" square tube .5" thick wall of an undetermined alloy. Any thoughts? I considered a stainless alloy for main base rails.
I am scared of resonance so I will fill the tubing with an asphalt based material.
Everything will be machined to as near square and flat as I can then welded. These components will then get sent for stress relief and final grinding. Come back for drilling pinning and bolting.
I will get the little machine shop spindle replacement unit.
I will use the most accurate rails and ground screws I can get. To get a more accurate screw a little cheaper I will spin the nut and use whatever I find in my application range, length and accuracy wise.

I do not know what to use for my motive forces yet. I have a linistepper drive coming and will play with that on the 8x14 lathe, but I think this mill will do some decent cutting, and I want motion control to match to the specs of the frame.

I have a feeling I am going to have to add another motion stage for the tool changer.


Anyone know of a good grinding shop in the Tampa bay area?

I will update the design as it progresses.


Here is a more detailed table drawing.

This will be one welded structure. The raised datum edges are clear in this view.
Attached Thumbnails
Click image for larger version

Name:	table1.jpg‎
Views:	147
Size:	31.2 KB
ID:	60175   Click image for larger version

Name:	framebottompic1.jpg‎
Views:	77
Size:	33.6 KB
ID:	60217  

Last edited by antichip; 05-24-2008 at 04:31 PM.
Reply With Quote

  #2   Ban this user!
Old 05-26-2008, 10:41 PM
 
Join Date: Apr 2005
Location: us
Age: 37
Posts: 98
antichip is on a distinguished road
The design evolves

I called and was quoted a price of nearly 800 dollars for the 20 foot section of 6"X6" Steel tube .5" wall thickness.

I was a little stressed over the cost of the steel today. I asked a few people and looked at a couple other types of machines built with 4x4x.25 tube.

So I decided I will be using .25" wall 6x6.


There was a machine shop or 2 closing around here with stock for sale. I will look into that tomorrow.

As designed before with .5" wall tube weight would have been around 1800-2000lbs just for the frame unit. That also scared me a little. But as a benefit, that is the stationary mass. My weight load per axis should be real reasonable.

I will also get info on the grinding job tomorrow, and we will see what the bill will be for that.
Attached Thumbnails
Click image for larger version

Name:	mill1.jpg‎
Views:	107
Size:	26.5 KB
ID:	60307  

Last edited by antichip; 05-27-2008 at 03:57 PM.
Reply With Quote

  #3   Ban this user!
Old 08-03-2008, 09:41 PM
 
Join Date: Apr 2005
Location: us
Age: 37
Posts: 98
antichip is on a distinguished road

Well a couple months later and I am rethinking this. I have aquired many many parts, but not nearly enough to get actually started. I have 5 32 inch rails and 5 sr15 trucks. I will order more trucks so I have 2 per rail. I also got 5 us digital linear encoders, but they are only 360 lines per inch. 7 tenths that would make with quadrature encoding right? These were part of a medical aiming device at one point. I was hoping to be able to use the connected pmd based board ( http://www.pmdcorp.com/advanced-moti...ontrol-ics.cfm ), but I have yet to make serial contact with the board. They would be nice as they would allow for near direct use of the current hardware. The unit also had a very set of laser line generators. Very clean lines. I will use 2 for x-y positioning and maybe one on the side for a rough z measure. I also have about 100 misc steppers in the 100 oz range.

Actually the amount of stuff I aquired over the last 2 months is no less than amazing. Computers for all 4 machines. I added a x2 and a HF 4x5 micro lathe to the shop.

My issue is that I am trying to do this on a very limited budget as we all are. but I am making progress.
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Getting started w/Taig CNC mill Oznog Taig Mills & Lathes 11 01-26-2008 12:52 AM
getting started with mach3 mill and connecting it with x3 mill dsingh82 Mach Mill 4 06-19-2007 03:43 PM
CNC Mini Mill _Cant get started Lou Craven Benchtop Machines 7 02-22-2007 11:40 PM
Gen 3 Mill started (Part#1 posted) FrankG DIY-CNC Router Table Machines 1 05-28-2006 09:42 AM
Lets get started; new mill Stevie Vertical Mill, Lathe Project Log 4 05-19-2005 09:09 PM




All times are GMT -5. The time now is 06:51 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361