Results 1 to 5 of 5

Thread: Another Setup Question...

  1. #1
    Registered
    Join Date
    Mar 2005
    Location
    USA
    Posts
    284
    Downloads
    0
    Uploads
    0

    Another Setup Question...

    Ok, I have read until I am nearly blind. Learned a ton, but still a bit short on what I need.

    I am running TurboCNC with a Xylotex board. The HF mill has 6 inch lead screws. The Xylotex board is suppose to be set for 1/8 micro. I have geared down to 4 to 1.

    What should the scalling be set to? Using the calc screen, I set step/Rev at 1600, lead 6, microstep (what is this?) 1, and Gear ration 4 to 1.

    With this setting, a command to move .1 moves about .095. Repeated moves generate the same result. I changed the pulse width from 2 to 10 and this changed nothing.

    Thoughts, suggestions?


  2. #2
    Community Moderator ger21's Avatar
    Join Date
    Mar 2003
    Location
    Shelby Twp, MI....USA
    Posts
    22,280
    Downloads
    0
    Uploads
    0
    Lead = 1/turns per inch. Microstep should be 8 on a Xylotex by default. And step per rev = 200. By using 1600 and 1 for microstep, you have the same thing. THe pulse width changes the length of the signal, it doesn't affect distance. Keep it around 2-3 if it works OK.
    Gerry

    Mach3 2010 Screenset
    http://home.comcast.net/~cncwoodworker/2010.html

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  3. #3
    Registered
    Join Date
    Mar 2005
    Location
    USA
    Posts
    284
    Downloads
    0
    Uploads
    0
    Quote Originally Posted by ger21
    Lead = 1/turns per inch.
    Lost me on this one. The lead screw is suppose to be 6 turns per inch. The scales show 1 turn = .167.


  4. #4
    Community Moderator ger21's Avatar
    Join Date
    Mar 2003
    Location
    Shelby Twp, MI....USA
    Posts
    22,280
    Downloads
    0
    Uploads
    0
    OK. You had it correct the first time. You either have some minor error in your gearing, or your screw.

    .0000260417 Is what you should have, correct? divide .1 by .095, which is 1.0526315. Multiply 1.0526315 x .0000260417 and enter this into the scale. 0.0002741231

    This should correct the error. I would actually try doing some longer moves to figure out the actual difference, as the screw may have error in the particular spot you are measuring. Try different places on the machine, and average them.
    Gerry

    Mach3 2010 Screenset
    http://home.comcast.net/~cncwoodworker/2010.html

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


  5. #5
    Registered
    Join Date
    Mar 2005
    Location
    USA
    Posts
    284
    Downloads
    0
    Uploads
    0
    Quote Originally Posted by ger21
    the screw may have error in the particular spot you are measuring.
    This is probably the issue. I will measure the distance over 75% of the travel and average it from there.

    Thanks for the tips. I think I will cut some metal today.


Similar Threads

  1. CNC Lathe setup
    By mroy0404 in forum Mazak, Mitsubishi, Mazatrol
    Replies: 4
    Last Post: 04-24-2011, 10:44 AM
  2. Setup
    By ACME in forum General Metal Working Machines
    Replies: 0
    Last Post: 09-07-2004, 10:37 AM
  3. Anyone know anything about this setup?
    By efreak in forum DIY CNC Router Table Machines
    Replies: 1
    Last Post: 08-29-2004, 01:27 AM
  4. Master5 Setup
    By boxwood in forum Mach Software (ArtSoft software)
    Replies: 0
    Last Post: 11-04-2003, 08:35 PM

Posting Permissions


 


About CNCzone.com

    We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

Follow us on

Facebook Dribbble RSS Feed


Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.