Results 1 to 2 of 2

Thread: dwell cycle problem on tree vmc 750

  1. #1
    Registered
    Join Date
    Jan 2009
    Location
    Canada
    Posts
    13
    Downloads
    0
    Uploads
    0

    Unhappy dwell cycle problem on tree vmc 750

    i am unsuccessfully trying to get my machine to undergo a dwell cycle with a drill (code G82), but the preset dwell time is 1.5 seconds, is there anyway to change the time the machine dwells? i think this is a machine problem and not a mastercam post problem
    Last edited by sp4i6; 01-08-2009 at 03:48 PM.


  2. #2
    Registered
    Join Date
    Jan 2009
    Location
    Canada
    Posts
    13
    Downloads
    0
    Uploads
    0
    i guess no one's ever tried to do this for longer than 1.5 seconds? (default)


Similar Threads

  1. Tree mill 325 E-Stop problem
    By HOSS in forum Test Forum
    Replies: 0
    Last Post: 12-02-2008, 08:10 PM
  2. Need Help!- programing a dwell cycle
    By pacnc in forum Fadal
    Replies: 2
    Last Post: 08-29-2008, 11:26 AM
  3. Newbie- programing a dwell cycle
    By pacnc in forum Fanuc
    Replies: 10
    Last Post: 08-28-2008, 08:52 PM
  4. tree power problem
    By ahrmaracer in forum Tree
    Replies: 5
    Last Post: 04-01-2008, 10:44 PM
  5. changing dwell in peck cycle
    By cncmedcom in forum Post Processor Files
    Replies: 0
    Last Post: 02-03-2007, 02:31 AM

Posting Permissions


 


About CNCzone.com

    We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

Follow us on

Facebook Dribbble RSS Feed


Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.