![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| Surfcam Discuss Surfcam software here. |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
This might well be very obvious an deasy, but I cannot figure out how to verify two jobs in a row in SurfCam Verify V3. Say I want to run the roughing job, and remove a lot of material, then verify a finishing job. It looks like the fininshing job starts with the full stock, and that makes it difficult to see wether it moves correctly. Is there a way I can cintinue removing material based on the result of another job, in SurfCam verify,. Cheers Best regards Jens Tandstad |
|
#2
| |||
| |||
| During the verify operation, there is an Icon that says "save model". You can use this for what you are describing. Verify the rough operation and then save it using that button. Then when you want to verify the finishing operation, open the roughing model and use it from that stage. I hope this answers your question. Leo |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Problem- VERIFY ??? | nelZ | BobCad-Cam | 1 | 12-22-2008 07:28 AM |
| Extra Material Removal...Help | Cartierusm | ArtCam Pro | 16 | 07-31-2008 06:56 PM |
| Need Help!- VERIFY | LYN BYRD | BobCad-Cam | 6 | 02-12-2008 12:48 PM |
| removal of 4140 HR Annealed material | Zipdrive | General Metalwork Discussion | 4 | 01-11-2006 10:51 PM |
| material removal / air blower help | DrStein99 | DIY-CNC Router Table Machines | 2 | 10-21-2005 07:49 AM |