Need Help! Delay for scribe


Results 1 to 2 of 2

Thread: Delay for scribe

  1. #1
    Member
    Join Date
    Feb 2013
    Location
    USA
    Posts
    51
    Downloads
    0
    Uploads
    0

    Default Delay for scribe

    I added a scribe plate marker to my home built table and I've got it working but I need help with how to put in a path rule. I've just been testing a couple of small circles, one inside the other and my problem is I have to have the down pressure on my slide set so low so it doesn't dig in that it hasn't reached the table before the X,Y starts to move.

    On the small test file I've manually went in and added the G4 delays and it works fine but if I try to make a path rule near pierce it puts the delay in before the M7 code and not after. Does anyone know how to set this up so that the delay starts after my slide and scribe have started automatically?


    Thanks in advance!

    Similar Threads:


  2. #2
    Member
    Join Date
    Feb 2013
    Location
    USA
    Posts
    51
    Downloads
    0
    Uploads
    0

    Default Re: Delay for scribe

    For anyone that finds this down the road with the same issue Tom at CandCNC created the 11N post for the scribe so you can but delays in to compensate for the slow slide reaction.



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Delay for scribe

Delay for scribe