Alright guys, here's my story:

Got a smoking deal on a 96' TC22 ($2,000). Pop open the panel and find out that it's already been upgraded sometime around 2011 with a MOD (SSD) and the electronics are all super clean.

Now the Bad: The Utility wants $50K to run 3 phase the 5 miles out to the farm. No Deal.

I've read and re-read this thread from 2014: http://www.cnczone.com/forums/phase-...53132-cnc.html

I pretty much understand that I'd be running one 110 to L2 and then splitting the second 110 between L1 and 4L3 (jumped upstream of both fuses/breakers).

My machine is pretty much the same as dbtoutfit, except that I have breakers ("A-B Quality" H-series) instead of fuses.

Other than disconnecting the "T" terminal in my VFD (Yaskawa 626 VM3C)

What else do I need to modify so I don't melt the expensive stuff BP doesn't make anymore?

BTW: 4th Axis is in this machines future.

Thx everybody!

Similar Threads: