CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > Machine Controllers Software and Solutions > G-Code Programing > Parametric Programing


Parametric Programing (custom macro b, fadal macro, okuma user task)


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 10-06-2008, 07:04 PM
 
Join Date: Oct 2008
Location: United States
Posts: 4
bruced is on a distinguished road
Can one program be positioned easily on multiple tombstone faces?

We use Unigraphics CAD/CAM software and I need to know is there any easy ways to program one part and add parameters or macro B variables to the g-code program that will allow the program to run on multiple postions on the tombstone face and allow that same program to be ran on multiple faces. I have used a G52 local offset on Verical machines with success, letting the operator tell the program how many parts to run and how many parts have already been ran using a loop. Which reminds me of why we aren't using that method. They won't run it without that g-code program being ran through vericut. That is yet another issue. How to get the While loop statement to run in Vericut. Can anybody help with this?
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 10-07-2008, 03:53 PM
 
Join Date: Jun 2008
Location: United States
Posts: 1,500
stevo1 is on a distinguished road
I would use your work coordinate system G54-G59. What kind of control are you using? How do you use the position of the tombstome. Is there a bushing or do you just true up a part? If your faces have the same location each time you rotate to that face for example set G54 coordinates to face 1, G55 to face 2 ect. Then program off of the X0Y0.

A bit more information about your parts, were there located, and how you currently run them would help.

Stevo
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 10-07-2008, 06:00 PM
 
Join Date: Oct 2008
Location: United States
Posts: 4
bruced is on a distinguished road
Mazak PFH-4800 is the machine.

The controller is a Mazatrol 640M. We always have the operator set up the fixture and find their own zeros for G54, 55, 56, and so on for what they need. We have recently provided offset tapes that set the offset values for different P numbers. In one case P2, P4, P6, P31, P35. Not sure exactly who decided what P numbers are at what angles, but P2 is on the 0 face and it is rotated using B0 in program. P31 is 65.007 degrees, P4 is 270 degrees, P6 is 90 degrees and P35 is 32.5 degrees. They are setting the zeros using G90G10L20P lines with appropriate x,y,z values. This is a better way than what we have been doing it and we still do it the old way, where operators find their own zeros. It just seems like there has to be a better easier way to manage this and run the quantity of parts we want to run with a simple change of a quantity variable and a looping method to go as far as changing the tombstone face if the part quantity requires that to be done. Almost forgot, the P number line is like this, G90G54.1P35, next line G90B32500 . We have started to look at a new way to load parts on a completely different machione using a tombstone zero and known fixture parameters, so all that is need is to have the right program and the right fixture to load and run without having to make any initial part zero adjustments. (It's about time)
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 10-15-2008, 08:09 PM
MaCroB's Avatar  
Join Date: Sep 2008
Location: USA
Posts: 23
MaCroB is on a distinguished road
We have a Makino MMC with A61 machines which I use rotational macro's quite a bit. Our system is automated, so there's no operator interaction, but I am sure something similar can be done on yours. All of our G54 through G59 values are preset in an offset subroutine. Since are parts from face to face are identical, I use an incremental loop program that changes the WPC value after each face rotation. A GE statement in the cycle loop checks the WPC and goes to the next tool when all the faces have been ran.

As far as getting something like this to verify in Vericut, I doubt it. I don't know of any verify programs that are capable of reading macro's.
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 10-16-2008, 12:28 AM
 
Join Date: Oct 2008
Location: United States
Posts: 4
bruced is on a distinguished road
The way we have been doing it is by making the program massive and it includes all parts on each face if we are running four faces then they might have one program for that and one for two faces and another for just one face. They are trying to get the run time up so the machines can stay running longer. Any experience telling you this won't improve our production times? Then there's the part about having to make mulitpl fixtures for the same part for all the faces. It almost seems like we lose what we gain by having to make all these fixtures. Do you use any modular fixturing you could recomend? It's true that we might have the machine run longer, but I am almost thinking that we will have more down time between pallet runs loading and unloading parts. I am not sure there's any saving in that besides there not being an extra set of tool changes for each part. I like the idea of using a loop to cycle through the WPC's. It would make loading the programs faster since they would be smaller tapes. I am thinking I could make a text editor script to add the needed variables or maybe add them by hand in the CAM, but it seems hard to get anyone to change here.
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Control panel faces DrStein99 General Electronics Discussion 5 09-24-2008 02:00 PM
Program g-code for mill as multiple tool lathe? Monte G-Code Programing 12 04-19-2008 12:18 AM
Inexpensive Wireless Intranet Based Program Transfer to Multiple Machines ChopperDoc General CNC (Mill and Lathe) Control Software (NC) 0 05-21-2006 01:36 AM
Rock and Stone faces SamLS General CAM Discussion 4 10-27-2005 10:22 PM
How to cut multiple parts (loop a program) Bird_E Mach Software (ArtSoft software) 6 05-13-2005 04:16 PM




All times are GMT -5. The time now is 02:50 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353