Ash,
I get 12 seconds here with your example settings.
That is with the default post.
You sure you don't have a second finish pass set ??
You could post your sample file to look at.
Hi all.
My problem is the cycle time on Xr4.
When i turn a length in Z-, then go onto job sheet, the cycle time is out.
Example
If i turn 20mm long at 1000rpm .1 feed rate, i should get 12 secs.
One cnc job sheet gives me 23 seconds.
Has anybody got any ideas?
Thanks in advance.
Ash