ALARMS ALARMS ALARMS


Results 1 to 6 of 6

Thread: ALARMS ALARMS ALARMS

  1. #1
    Registered
    Join Date
    Nov 2006
    Location
    usa
    Posts
    49
    Downloads
    0
    Uploads
    0

    Default ALARMS ALARMS ALARMS

    hey guys,
    I am trying to synch the spindles with a M151 code on a 2 spindle lathe with OSP7000l controller and I keep getting an 1239-01 "VAC spindle synchronous condition" alarm. Anyone know what this means and how to fix it?
    Thanks in advance
    Dave

    Similar Threads:


  2. #2
    Member OkumaWiz's Avatar
    Join Date
    Apr 2009
    Location
    United States
    Posts
    1262
    Downloads
    0
    Uploads
    0

    Default M151

    There are a number of things to look at, but most likely is that both chucks are closed. In order to sync, the opposite spindle needs to orientate to the first one and it can't do it if they are both clamped since this would potentially twist a clamped bar. If that's not it look at the alarm code and it should be more specific as to which thing is causing the fault such as c-axis engagement, nose comp active, etc.



  3. #3
    Registered
    Join Date
    Nov 2006
    Location
    usa
    Posts
    49
    Downloads
    0
    Uploads
    0

    Default

    there is also a chuck interlock cancel command M185 and M247 but those give me an alarm 1249"chuck interlock cancel condition" Caxis is not clamped TNS is canceled constant surface feed is canceled..... These are the only 2 commands that I cant seem to get to work.



  4. #4
    Member OkumaWiz's Avatar
    Join Date
    Apr 2009
    Location
    United States
    Posts
    1262
    Downloads
    0
    Uploads
    0

    Default To Sync or not to Sync...

    Sounding more like the C-axis is engaged, but did you just try going to MDI typing in M151 ,write, cycle start with the doors closed and both chucks unclamped? If it gives you an alarm, there should be a specific "code" pointing more specifically to what is causing it. Use the help function on your control to reveal the details. If you have more questions, call me 262-339-8227.

    Ryan



  5. #5
    Registered
    Join Date
    Dec 2008
    Location
    Canada
    Posts
    79
    Downloads
    0
    Uploads
    0

    Default

    try this if it works, it's for a p200 control, you absolutely need the m247 to get it to work)

    Code:
    G140
    G50S1000
    G97S50M3
    M247 (M TOOL SPINDLE INTERLOCK OFF)
    M249 (SUB CHUCK OPEN)
    G04 F.1
    M89 M289 (MAIN/SUB AIR BLOW ON)
    G04 F.1
    M151 (SYNCHRONIZED ROTATION ON)
    G4 F30
    M150 (SYNCHRONIZED ROTATION OFF)
    G94
    M5
    M2




  6. #6
    Member Algirdas's Avatar
    Join Date
    Mar 2009
    Location
    United Arab Emirates
    Posts
    1982
    Downloads
    2
    Uploads
    0

    Default

    it's helpful if this machine is equipped with IGF.
    You set-up two processes part program and IGF generates workpiece transfer program fragment automatically (according it's parameters).
    Then you can check generated "min" program and understand when what why



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

ALARMS ALARMS ALARMS

ALARMS ALARMS ALARMS