CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking Machines > Novakon Systems


Novakon Systems Novakon Systems machines here!


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 10-22-2009, 09:48 PM
 
Join Date: Jun 2006
Location: USA
Posts: 819
David Da Costa is on a distinguished road
Ordering a NM-135

I am going to be ordering a NM-135 tomorrow to replace my LMS 3501.

My big challenge like a few others here is going to be getting it up the garden steps (see pictures) into my office. My office door is not going to be a problem as it is extra wide.

So my options are going to be to hire some muscle (4 people) to try to lift it up the steps, but I am nervous about doing this due to the constraints imposed by the wall either side of the steps and the potential of damage.

The second option is to break the mill down into 2 or 3 chunks and use a hand truck to get it up the stairs.

If I go this route I will probably buy the 1 ton folding shop crane, 1000 lb movers dolly and a 2 ton lifting sling from Harborfreight and this hand truck http://www.handtrucksrus.com/crashde...ID=249&cx=comp.

Any thoughts/ suggestions from fellow NM-135 users?

Thanks

David
Attached Thumbnails
Click image for larger version

Name:	photo.jpg‎
Views:	52
Size:	145.8 KB
ID:	91728   Click image for larger version

Name:	photo-4.jpg‎
Views:	60
Size:	123.6 KB
ID:	91729  
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 10-22-2009, 10:44 PM
 
Join Date: Apr 2009
Location: USA
Posts: 21
Dave Berryhill is on a distinguished road
I have moved a large 700 lb gun safe up and down stairs several times using a refrigerator dolly. It isn't easy but it's doable with 2 or 3 strong guys so you should be able to do it if you break the mill down into a couple of pieces. Make sure that the load is strapped securely to the dolly and take it one step at a time. Put one guy on the handles pulling it up the stairs and 2 guys lifting from the other side.
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 10-23-2009, 01:12 AM
 
Join Date: Aug 2009
Location: USA
Posts: 30
saltytri is on a distinguished road
You might be overthinking this. The Armstrong Method is hard to beat. I'll bet it could be carried without mishap.

I wouldn't want to break the mill down if it can be avoided. This will be more work than you might think and you'll still have some really heavy pieces that have to be correctly reassembled. Not fun.

Your location is "USA" so I would guess that you have a high school nearby. Most self-respecting high schools have a football team. Most self-respecting football teams have some pretty big and buff guys. Call the school, the coach or the booster club. Hire 4 or 5 inside lineman. They probably need a break from the weight room anyway.

I'm perfectly serious. I did this to move in a 400 pound lathe. Three guys did it in 5 minutes without breaking a sweat and nary a grunt even. Ten bucks each, they were happy, and I was happy. They approached the task with the utmost seriousness and teamwork.

I have good reason to believe that this will work out just fine since as I type this there is a brand new NM-135 sitting on the bench two feet away. (I now have an engine crane and my entry path is flat, so I was able to dispense with the gorillas this time). The crate that surrounds the mill can be peeled off, leaving it bolted to a stout plywood base. It would be easy to carry it bolted to the base. If you think that the base is too wide, cut it down or replace it with a couple of two by twelves.

Whatever you decide to do, Good Luck and congrats on the new mill!!
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 10-23-2009, 02:49 PM
 
Join Date: Jun 2006
Location: USA
Posts: 819
David Da Costa is on a distinguished road
I can get the manpower, so that is not an issue and I guess I could get two pieces of wood (2x4 or similar) and bolt them to the base and then use them as carrying/lifting handles (medieval litter style) with 4 people lifting.

I think you are right I am overthinking this which already caused me to originally buy the KX1 from LMS.

Anyway, I pulled the trigger this morning (pleasure talking to Khai) and it should turn up in California at the end of next month.

In the meantime I am going to start designing an enclosure.

Could someone who owns a NM-135 with the stand give me a few measurements.

1. What is the width and length of the widest part of the Coolant catch tray on the bottom of the machine.

2. What is the depth of the top flat lip of the coolant catch tray (I intend to bolt the base of the enclosure around this).

3. What is the maximum width (x axis) of the machine with the x axis at its furthest extents in each direction and the same for the y axis. I need this to calculate the minimum size of the enclosure.

Thanks

David
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 10-23-2009, 03:04 PM
 
Join Date: Aug 2009
Location: USA
Posts: 30
saltytri is on a distinguished road
David:

I'm at work now but I'll do some measurements tonight.

David also
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 10-23-2009, 03:17 PM
 
Join Date: Jun 2006
Location: USA
Posts: 819
David Da Costa is on a distinguished road
Great - Thanks!
Tweet this Post!Share on Facebook
Reply With Quote

  #7   Ban this user!
Old 10-23-2009, 09:23 PM
 
Join Date: Aug 2009
Location: USA
Posts: 30
saltytri is on a distinguished road
1. 36.125" x 24"

2. Not sure what you mean. 1
1.8" across the rim, i.e., across the top of the inverted "U" channel that forms the perimeter of the tray
.8" is the height of the rim, i.e., the side of the inverted "U"

3. 35" deep, but allow at least 2.5" more for the connectors on the back
46.5" wide for the total envelope
Tweet this Post!Share on Facebook
Reply With Quote

  #8   Ban this user!
Old 10-23-2009, 09:46 PM
 
Join Date: Jun 2006
Location: USA
Posts: 819
David Da Costa is on a distinguished road
Perfect! Thank you very much.

I will post my enclosure design once done.

David
Tweet this Post!Share on Facebook
Reply With Quote

  #9   Ban this user!
Old 10-24-2009, 12:53 AM
 
Join Date: Aug 2009
Location: USA
Posts: 30
saltytri is on a distinguished road
You're very welcome. I'm interested in seeing what you come you with for an enclosure. In the meantime, I'm getting started with the new adventure of learning Mach3 and making the thing run!
Tweet this Post!Share on Facebook
Reply With Quote

  #10   Ban this user!
Old 11-05-2009, 03:16 PM
 
Join Date: Jun 2006
Location: USA
Posts: 819
David Da Costa is on a distinguished road
Today I had bad news and good news from Khai.

The bad news is that my mill has been delayed by two weeks.

The good news is they are making some improvements to the mill.

The first change is adding a thermal cooling fan to the spindle head assembly. This will decrease operating temperatures and prolong spindle life.

The second change is integrating a coolant nozzle to the machine, just like on the NM-200. This will allow you to simple add a coolant hose and a pump if the need arises.

They are removing the splash guard from the table.

David
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #11   Ban this user!
Old 11-05-2009, 03:23 PM
 
Join Date: Jun 2006
Location: USA
Posts: 819
David Da Costa is on a distinguished road
deleted - duplicate
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Newbie- Ordering a NM-135 keithmcelhinney Benchtop Machines 7 05-07-2009 03:33 AM
need help ordering radiantheat Granite Devices 10 02-16-2009 09:37 AM
Ordering a K2 3925 GuitarEng Commercial CNC Wood Routers 20 03-01-2007 05:06 PM
Ordering Rhino 4 justCNCit Rhino 3D 5 03-01-2007 11:57 AM
Ordering screws studysession General Metalwork Discussion 1 03-20-2005 10:28 AM




All times are GMT -5. The time now is 09:30 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353