So far for the 10 minutes I ran the machine today I am happy.
Only a slight bit of issues with assembly. Nothing crazy.
1. The holes for the coolant tank were wrong. It needs to be welded and a new hole drilled.
2. The 4th axis female receptacle was clocked the wrong way , it wouldn't allow you to connect the male side , it has to be turned 90 degrees.
3. The front of the splash guard needed to have two holes elongated so it would fit properly.
4. Spindle speed needs to be calibrated ( nothing big ).
That's it for now.
I am happy with the machine. I fit it through a 36 " wide door. So those who wonder, it can be done. I had a rigger company get the machine up on the stand because the hoist I had wouldn't lift it.
It took me about 3 hours to assemble the machine after it was on the stand. The first try I thought man, whats going on , it wont power up. But I forgot to flip the breaker ( lol ).
So everything pretty much out of the box seems to be working right now as of the few minutes I had it running today.


LinkBack URL
About LinkBacks





