![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| NCPlot G-Code editor / backplotter Discuss NCPlot software here. |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
I found out why a 35 sec job will read 35 seconds (That's correct). Other jobs about the same sec will read 2 min 45 seconds. The difference is jobs that thd with the G76 cycle will show 3 or more times the actual time. Been wondering why some the time is right & some it's way to much. |
|
#3
| |||
| |||
| 25M:29S Actual time is 38 seconds. Not all my lathe programs do this about 2/3 are the right cycle time, the other end of this part is right 23S. I just can't see why. &HE:% :0458(BEN-SHAFT-M10) G20 G65P9150H1.(SET-FOR-50-90-PS1) (BEN-BENT-SHAFT-M10) (P/N-SHAFTBENTM10-JOB->O458) N3(-TURN-&-FACE-T0303) (PUT-TOOL-NOSE-RADIUS-IN-GEO-FILE) G97M13S2500 M98P1 T0303 G99 G00X.6Z.200 Z0.080 G01X-0.060F0.006 G00X0.600 Z0.040 G01X-.060F.006 G00X.600Z.055 Z0. G99G01X-.06F.006 G00X.04Z.100 G01G42X-.06Z0.F.010 G01X0.3110F.0060 G01X0.3910Z-0.0400F.0075 G01Z-1.0000 G01X0.470 G01X0.5000Z-1.0150F.004 G01Z-1.1000X.510 G00X.600 M98P2 N5(-THD-OD-CUT-T0500) G97M13S2000 M98P1 T0505 X0.515Z0.375 /G76P010055Q0015R.0004 (P=SPRING-PASSES.P--=PULL-OFF-DIS.P----=COMP-ANGLE) (Q=MIN-PASS-DEPTH.R=FINISH-PASS-AMOUNT) /G76X0.3185Z-1.018P0362Q0128R-.0F0.059067 (X=ROOT-DIA-Z=LENGTH-P=SINGLEDEPTH-Q=1STPASSDEPTH-R=TAPER) M05 M98P2 /M21 G00Z8. M30 % |
|
#4
| |||
| |||
| I did find one thing, the other end says Average Feed Rate 28.9098 & it is correct at 38 seconds. the above says 0.2831, seems most all the programs that the cycle time is right have Average Feed Rates of 26.... to 29.... All those that come out way to long have a verysmall number in the AFR. I run these jobs all the time so I know the run fine. this is weird. |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Part Cycle Time | Big"E" | Mastercam | 2 | 02-19-2007 08:04 PM |
| Long cycle time? | CNCtoday | Polls | 5 | 09-28-2006 12:28 PM |
| cycle time macro program | mcash3000 | General CNC (Mill and Lathe) Control Software (NC) | 1 | 03-29-2006 01:33 PM |
| cycle time formula | cncsdr | General Metalwork Discussion | 7 | 12-29-2005 07:21 PM |
| Max Tapping speeds/increasing cycle time | jderou | General Metalwork Discussion | 7 | 12-23-2005 08:51 AM |