![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| Milltronics Discuss Milltronics Machines |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
Cent 5 control . Had the original software upgraded sometime in the past , before I bought it . Just saw the control has Bore2 cycles along with the choice of drill cycles . As I program mostly in conversational , does anyone have the pages of the manual pertaining to the generated code for these cycles ? They are : FAST BORE /FINISH BORE /BACK BORE / MANUAL BORE . I was wondering what cycle does a through bore , spindle stop , spin orient , and retract . If I mount a Criterion head in a cat 40-3/4" EM holder , I am assuming I need to orient the head a specific direction , so I can do an X move before retracting the Z . Thanks |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Need Help!- canned cycles | astro cnc | G-Code Programing | 3 | 02-17-2009 09:40 AM |
| different peck cycles? | C5turbo | Fanuc | 9 | 11-06-2008 06:03 AM |
| G85 for Boring Cycles? | stuby | G-Code Programing | 5 | 01-23-2008 02:04 AM |
| canned cycles on 16t? | DocHod | Fanuc | 3 | 07-08-2007 08:58 PM |
| G90/G91 in canned cycles | alfalfa | CamSoft Products | 18 | 02-25-2007 06:20 AM |