![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| Mazak, Mitsubishi, Mazatrol Discuss Mazak, Mitsubishi and Mazatrol systems here! |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
I have recently bought a used VQC20/40B. It came with a pile of manuals but I cannot find the instructions for locking the ways for transport. One of the manuals shows where to lift the machine with cables, but does not mention if the ways need to be locked, or if there is a counterbalance to be locked. Can anyone tell me how prepare this machine for transport? |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Preparing for pmaker training | Mike-G | Partmaker | 1 | 04-05-2011 07:30 PM |
| Need advice on the value of 8020 pieces. Transport or sell? | pswayze | DIY-CNC Router Table Machines | 15 | 05-19-2010 04:50 AM |
| Need Help!- Transport in the cold | RAMI | General Metal Working Machines | 3 | 01-04-2010 11:01 AM |
| How do I transport a Tree 425? | cfordyce05 | General Metalwork Discussion | 8 | 09-29-2009 01:06 PM |
| Alternative Air Transport for the 21st Century | thkoutsidthebox | Mechanical Calculations/Engineering Design | 4 | 08-16-2008 05:28 PM |