![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| Mazak, Mitsubishi, Mazatrol Discuss Mazak, Mitsubishi and Mazatrol systems here! |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
Hi everybody, I'm new to this forum & I was wondering if any body nows how to set up tool change in EIA/G code for M2 control so that it will preload the next tool the way that it does in Mazatrol. I set it up this way N6 T1 M39 N7 M06 N8 S1497 M03 N9 T2 N10 G54 G90 X2. Y0. N11 G43 Z.1 The problem is that it will preload the next tool, however, the machine will not execute the G54, or any movement as far as that goes, until the tool is preloaded. It will not load the tool during operation the way that Maztrol does. Any suggestions? Thanks |
|
#2
| |||
| |||
| I stage my next tool after my g42 line and after my op. stop. I like to move my tool to the first x y location and use a M1. That way the tool carousel will wait until I can inspect the tool and press the cycle start button. I have a 120 tool carousel and it eat up a lot of time waiting for the tool changer to get finished before I can press the reset button if needed. |
|
#3
| |||
| |||
| Thanks, I'll give it a try, but when I first started this several months ago I placed it at the end of a cut or before the last line in a cut but the G01 move stopped & waited for the tool to be preloaded, but I have not tried it right after G42/43. |
|
#4
| |||
| |||
| Thanks all, I got it to work like this N6 T1 M39 N7 M06 N8 T2 N9 S1497 M03 N10 G54 G90 X2. Y0. N11 G43 Z.1 I tried this several months ago & it didn't work, but it works now??? I don't know what I did wrong in the past, guess I just needed to step away for a while. |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Problem- 21iT: Using 2 offsets for 1 tool:Machine stops for tool change | gnmachine | Fanuc | 4 | 02-01-2011 08:10 AM |
| need help wana make macro for getting tool change by giving tool pot no on vmc instea | ghevari | Parametric Programing | 0 | 02-14-2010 12:26 PM |
| orient tool for tool change Hall effect? | Luslugger | CNC Machining Centers | 0 | 04-24-2009 06:24 PM |
| Very slow tool change on Tool Room Mill | Capt Crunch | Haas Mills | 3 | 12-21-2007 12:20 PM |
| How to change Tool change position(About MAZATROL T1 control) | liushuixingyun | Mazak, Mitsubishi, Mazatrol | 5 | 07-07-2007 02:58 PM |