CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > Machine Controllers Software and Solutions > Mazak, Mitsubishi, Mazatrol


Mazak, Mitsubishi, Mazatrol Discuss Mazak, Mitsubishi and Mazatrol systems here!


Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 12-21-2010, 04:17 PM
 
Join Date: May 2010
Location: USA
Posts: 86
pontiacg5 is on a distinguished road
Checking tooling on T-Plus

I've got a SQT10M and I'm trying to make a bunch of little parts using a bar puller. I seem to hit hard spots in the material and I'll break 10 endmills in 20 parts then run 200 parts with a single endmill. After an endmill breaks though the machine continues to make parts which are all scrap. I can't be there watching it all the time to check the tooling, and anyone who has ever run a SQT lathe knows you can't hear ANYTHING when that mill spindle is running!

I know the mills have some sort of macro that checks the tool length at certain intervals and alarms out if something doesn't match up. Is there any similar cycle that uses the tool eye on the lathe, possibly before the bar is pulled but after the part drops? I've read the entire Mazatrol programing book for the T plus controller and don't recall reading anything like that. I haven't gotten to the real programming book yet though...

Does anyone have any idea what I'm talking about or where to start looking to figure this out?
Thanks!
Reply With Quote

  #2   Ban this user!
Old 12-22-2010, 11:37 PM
 
Join Date: Jul 2006
Location: USA
Posts: 19
Philabuster is on a distinguished road

Yes, this is done very easily.

For a Mazatrol program, make a Process Number (PNO) tool length setting ( I cannot remember exact name) after the end mill Process. Input which type of tool you are measuring--type 1, 2, etc. This is only a two line Process, so it's not complicated. You will then give a tolerance to each axis (say 0.010"). Anything over the amount you specify will alarm out the machine and stop. If you only tolerance the X axis, that is the only axis the machine will measure.

With end mills, you only wish to measure the length, so set that axis as the measuring axis. This may become an issue with larger end mills that need the flutes lined up with the tool eye.

Keep in mind, the tools need to already be manually probed to be checked automatically. The machine cannot auto probe a fresh end mill using this method as the machine RAPIDS to within 0.100" or so of the tool eye (parameter setting for clearance amount).

Slow down the rapid override the first time this process runs. The machine rapids full tilt toward the tool eye in auto measure mode. It WILL scare the dog crap outta you if you do not expect it.
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need Help!- Newbie checking in jmersereau DIY-CNC Router Table Machines 5 12-07-2009 08:56 PM
Newbie- Checking out a hurco Dave Rothermel HURCO 3 07-16-2009 05:33 PM
CHECKING CHANDRU Fanuc 1 12-24-2007 07:48 PM
Checking for a bad motor. impact General Electronics Discussion 0 08-09-2007 04:29 PM
Double Checking!! chas Gecko Drives 4 04-11-2005 11:38 PM




All times are GMT -5. The time now is 12:19 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361