Hi everybody, I'm new to this forum & I was wondering if any body nows how to set up tool change in EIA/G code for M2 control so that it will preload the next tool the way that it does in Mazatrol. I set it up this way
The problem is that it will preload the next tool, however, the machine will not execute the G54, or any movement as far as that goes, until the tool is preloaded. It will not load the tool during operation the way that Maztrol does.
I stage my next tool after my g42 line and after my op. stop. I like to move my tool to the first x y location and use a M1. That way the tool carousel will wait until I can inspect the tool and press the cycle start button. I have a 120 tool carousel and it eat up a lot of time waiting for the tool changer to get finished before I can press the reset button if needed.
Thanks, I'll give it a try, but when I first started this several months ago I placed it at the end of a cut or before the last line in a cut but the G01 move stopped & waited for the tool to be preloaded, but I have not tried it right after G42/43.
Thanks all,
I got it to work like this
N6 T1 M39
N7 M06
N8 T2
N9 S1497 M03
N10 G54 G90 X2. Y0.
N11 G43 Z.1
I tried this several months ago & it didn't work, but it works now??? I don't know what I did wrong in the past, guess I just needed to step away for a while.