Mazatrol Matrix eia work shift


Results 1 to 2 of 2

Thread: Mazatrol Matrix eia work shift

  1. #1
    Member positiverake's Avatar
    Join Date
    Sep 2005
    Location
    United States
    Posts
    267
    Downloads
    0
    Uploads
    0

    Default Mazatrol Matrix eia work shift

    Need help with mazak lathe matrix control, I want to shift the Z work shift in the program (eia) so i can run multiple parts. I'm using the mazak tool data side (G53.5) and not the G54-G59 any help would be great. thanks

    Similar Threads:


  2. #2
    Member
    Join Date
    Jan 2010
    Location
    Norway
    Posts
    171
    Downloads
    0
    Uploads
    0

    Default Re: Mazatrol Matrix eia work shift

    G52W-(shift amount) If im not wrong.



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Mazatrol Matrix eia work shift

Mazatrol Matrix eia work shift