Need help with mazak lathe matrix control, I want to shift the Z work shift in the program (eia) so i can run multiple parts. I'm using the mazak tool data side (G53.5) and not the G54-G59 any help would be great. thanksSimilar Threads:Need Help!- how to make NPT threads in Mazatrol Matrix Mazatrol Matrix Mazatrol Smart vs. Matrix How to run XC milling on Mazak Integrex Mazatrol Matrix Mazatrol 640M/ Matrix Post
G52W-(shift amount) If im not wrong.
View Tag Cloud
Forum Rules