CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > CAM Software > MadCAM


MadCAM Discuss MadCAM software here.


Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 08-22-2008, 02:10 AM
 
Join Date: Jul 2008
Location: USA
Posts: 38
etzz is on a distinguished road
Madcam - 4 axis indexed ring machining

Hello,

I have been practicing more with Madcam, and am going to try to machine a ring in wax using my new rotary axis (taig setup). These operations might seem obvious to a veteran, but for me, I had to think about how best to do this. A couple of options were:

-Machine entirely in 3D and then use a program like WRAPPER that will take the Y axis moves, and re-compute them for the rotary axis (wrapping Y moves around the X axis creating a cylinder). Depending on how good the compute algorithms are, I could see where some distortion could result from the wrap of the flat 3d geometry into a cylinder shape. So I opted to...

- Machine using indexed 4D. This was done by breaking the ring up into 8 regions all at 45 degree offset in the Rhino Cplane. Because the eight segments are identical, the same machining can be used on each section.

This is done by:

1- Set the clipping plane bottom towards the top of the ring.

2- Draw eight region curves around the ring that slightly overlap.

3- Machine a single region completely in 3D. This lets you simulate and optimize the 3D strategy before moving to the rest of the regions.


4- Implement the same 3D strategy on the rest of the seven regions. I think you can actually copy and rotate the toolpaths using Rhino, but I simpley re-computed after moving the Cplane by 45 degrees.


Note that the four corners of the part box are not roughed off. So options here would be to cut them off before mounting the part, or creating the toolpaths for this operation and running these operations first.
Regards,
Eric
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 08-22-2008, 02:28 AM
 
Join Date: Jul 2008
Location: USA
Posts: 38
etzz is on a distinguished road
And then you could finish up with a 4th axis finish pass. Not sure if this is needed, but I think it might be useful to save some of the indexed machining. ie, maybe run this and then run pencil z level and pencil tracing at the very end.



Eric
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 08-22-2008, 11:14 AM
 
Join Date: Jul 2008
Location: USA
Posts: 38
etzz is on a distinguished road
It struck me on the way in to work today...

It is not too hard to index the rotary table with a G1 A 45, 90, 135, etc. So it is probably easier to compute the machining for the first segment, and then copy/paste the GCODE or manually re-run on each region after advancing the rotary table.

The indexing is more useful when the part geometry is not replicated.

Eric
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 08-28-2008, 01:54 PM
 
Join Date: Jul 2008
Location: USA
Posts: 38
etzz is on a distinguished road
A final note...run all your roughing passes first, and then your finish passes (all the way around). Saves a lot of manual tool changes.
Eric
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Madcam 4th and 5th axis turmite MadCAM 6 02-21-2009 12:37 AM
Newbie- MadCAM and 4 axis cylinder/rotary etzz MadCAM 2 08-19-2008 11:34 AM
Machining snap ring groove Cairns General Metalwork Discussion 5 07-04-2008 03:34 PM
5 Axis indexed vs 5 Axis continuous jwolin General CAM Discussion 44 03-24-2007 03:21 AM
6 Axis Machining todd71 General Metal Working Machines 3 12-01-2006 11:12 PM




All times are GMT -5. The time now is 12:00 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353