![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| LinuxCNC (formerly EMC2) Discuss LinuxCNC (formerly EMC2) Controlers here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
Making a automatic tool changer for a Bridgeport knee mill but having a problem with long reamers and drills. The Z axis is only 5 inches so I want to extend this occasionally by putting a geared servo motor on the knee and tie it to the M100...? tool change sequence. I want to drop the knee down and then up to take out the backlash and adjust the tool length for the new table height needed for very long drill-chuck & drills. Anyone know what to put in the Hal and INI files to make this custom M-100? I am taxing my abilities on this one. This would be axis 5. I run servos but using steppers on the ATC. |
|
#2
| |||
| |||
| You might want to define the knee as the "W" axis and just have a "W" move as part of a tool change macro or defined tool change position. This allows you to use this knee travel when needed in your normal G-code programs not just during tool changes. |
|
#3
| |||
| |||
| I guess it is as easier than I thought. Just move down (W-5.0) and set the tool length from there and the program should run fine. Move back (W0.0) before I cut again with shorter cutters. Here I thought I needed a sophisticated M command. Good thinking. Thanks |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Dyna Mechtronics cnc Knee Mill need help with control | wisp | Knee Vertical Mills | 9 | 08-25-2011 03:35 AM |
| Longer parallel cable or longer steper wires? | jvanick | Hobbycnc (Products) | 12 | 09-13-2008 05:51 AM |
| Longer X-axis On Taig | DroopyPawn | Taig Mills & Lathes | 5 | 12-03-2007 03:43 PM |
| putting a pc control on a supermax cnc knee mill | imwllc | General Electronics Discussion | 2 | 08-14-2005 10:11 AM |
| BP Ser 1 , Ez Trak: Axis Readouts suddenly no longer accurate | XRM37 | Bridgeport and Hardinge Mills | 2 | 02-09-2005 10:04 PM |