CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > WoodWorking Machines > DIY-CNC Router Table Machines > JGRO Router Table Design


JGRO Router Table Design For the discussion of JGRO designed router table.


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1  
Old 06-01-2005, 02:33 PM
Gold Member
 
Join Date: Apr 2005
Location: US
Posts: 85
ignatz is on a distinguished road
Questions about JGRO Router

I have a couple of questions about the JGRO router plans that I'm hoping someone can help me with.

1. Is the assy04 connected to the base support structures? How?
2. Are the base supports connected to dtl05? How?
3. What is the single wood screw used for?
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 06-01-2005, 05:56 PM
The Wizard's Avatar  
Join Date: Aug 2004
Location: Canada
Posts: 117
The Wizard is on a distinguished road
Originally Posted by ignatz
I have a couple of questions about the JGRO router plans that I'm hoping someone can help me with.
Here's how I did mine......

1. Is the assy04 connected to the base support structures? How?
Yes, my 'cutting bed' (det'l 04) is a seperate piece to the 'bed support' (det'l 06) and the 'bed support' is bolted through the end frames (det'l 1 & 2) in four places (between the support rails). It was aligned flush with the top of the end frames and clamped into position and then the bolt holes were drilled right through both pieces to ensure correct alignment. The 'cutting bed' was installed after I had the machine up and running so that I could set the 'grooves' parallel to the gantry travel using a DTI. Once the 'cutting bed' was correctly aligned I 'spot drilled' through the ends into the end supports and then removed the 'cutting bed' again. I used three CSK head machine screws at each end between the 'grooves' and 'dry wall' screws in the small outer pieces. The machine screws are going into 'blind nuts' that I installed in the end frames using the 'spotted' marks to establish the correct location. By doing it this way everything can be unbolted if I ever have to replace a leadscrew, A-B nut or if I have to dismantle the machine if I move house.

2. Are the base supports connected to dtl05? How?
Yes, mine is bolted through the end frames in four places (between the support rails) too. I aligned the bottom of det'l 05 with the bottom of the end frames and then clamped and drilled through both pieces to ensure correct alignment. This was done prior to fitting the upper bed as described above. I also made four 'towers' out of MDF that were glued to the inside corners of the frame structure on det'l 05. The face of the 'towers' had a 'blind nut' inserted and my entire machine sits on four hockey pucks (with a CSK hole in the centre) that are screwed into the 'towers'. These act as vibration dampers and help to keep the noise down (my machine is currently in my living room as I have no workshop to work in at the moment!)

3. What is the single wood screw used for?
I didn't bother with that but it can be used as a reference point when establishing X/Y/Z zero.

If you want to have a look at my construction progress check out my build log here....... http://cnczone.com/forums/showthread.php?t=6244

I really need to update that as I have made some major changes/improvements since then and I am just about ready to start 'real' cutting jobs with it instead of test cuts and tweaks.

Hope the above is useful to you.

Larry
Tweet this Post!Share on Facebook
Reply With Quote

  #3  
Old 06-01-2005, 07:14 PM
Gold Member
 
Join Date: Apr 2005
Location: US
Posts: 85
ignatz is on a distinguished road
Hi Larry, Thanks very much for the post and the link to your thread. Your answers let me know that the pieces needed to be connected and gave me some direction. I don't think I'll be using the blind nuts because it exceeds my capacity. The thread answered some questions I didn't even know I had yet around alignment. You have a very nice machine. Cheers!
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 06-01-2005, 08:42 PM
The Wizard's Avatar  
Join Date: Aug 2004
Location: Canada
Posts: 117
The Wizard is on a distinguished road
Originally Posted by ignatz
Hi Larry, Thanks very much for the post and the link to your thread. Your answers let me know that the pieces needed to be connected and gave me some direction.
No problem, glad you found the information useful.

I don't think I'll be using the blind nuts because it exceeds my capacity.
I am not sure I understand the above? They do not require any special tooling to fit as they just screw into a drilled hole. I drilled mine with a hand held power drill and they are fine. If you are not familiar with them they have a large, coarse wood type thread on the outside diameter and a metal machine screw thread on the inside diameter. They are fitted with either an Allen hex head or a slotted head (depending on type/size) and you simply drill a hole the correct size in the MDF, add a drop of wood glue for strength and screw them in. You can see an example at the following link.... http://www.mcfeelys.com/subcat.asp?subcat=20.15.1

The thread answered some questions I didn't even know I had yet around alignment.
When it came to aligning the assemblies I used a length of 1/2" CRS inserted through the holes for the leadscrew bearings (I used bearings at each end of the leadscrews) to make sure that the frames and the carriages were truly in line and then roughly set up the pipes from there. I then removed the CRS once the pipes were roughly aligned and put in the bearings and leadscrews. The final alignment of the pipes was done once I had the machine powered up but 20/20 hindsight says it would have been easier and faster to do that before I mounted the leadscrews as I could have simply 'rolled' the carriages along the pipes with a DTI clamped to them rather than 'feeding' them along the pipes under power.

You have a very nice machine. Cheers!
Glad you like it and good luck with your build .

Larry
Tweet this Post!Share on Facebook
Reply With Quote

  #5  
Old 06-02-2005, 11:27 AM
Gold Member
 
Join Date: Apr 2005
Location: US
Posts: 85
ignatz is on a distinguished road
Originally Posted by The Wizard
I am not sure I understand the above? They do not require any special tooling to fit as they just screw into a drilled hole. I drilled mine with a hand held power drill and they are fine. If you are not familiar with them they have a large, coarse wood type thread on the outside diameter and a metal machine screw thread on the inside diameter. They are fitted with either an Allen hex head or a slotted head (depending on type/size) and you simply drill a hole the correct size in the MDF, add a drop of wood glue for strength and screw them in. You can see an example at the following link.... http://www.mcfeelys.com/subcat.asp?subcat=20.15.1
Wow! Thanks again... I didn't even know about those fasteners. I thought you cut a hexagon shaped hole in the wood and then glued a regular nut in it. The only way I could imagine doing that would be with a mill and a dividing head (which I don't have access to). Now the trick is going to be finding the fasteners locally.

My process for alignment seems cruder than yours. I started with the large gas pipes and leveled one to set the up/down alignment. I used a try square on both ends to make sure that the pipe was square to the base supports and set the left/right alignment. I put the gantry in place and inserted the other gas pipe. I leveled and squared the new pipe and across the gantry. I added the leadscrew and made sure that it aligned properly (I have two flanged bearings for the non stepper side so I used one in each end for alignement). At this point, the gas pipes needed a little more adjustment to make sure that all 4 bearings were touching the gas pipe. With this alignment, I was able to move the gantry by turning the leadscrew by hand. I repeated this process for the other axises and then removed all of the lead screws. I taped a piece of paper to the table and taped a pencil to the Z axis. I manually moved the machine in the X and Y directions (got that idea from you) and used a square to see how close I was... and I was pretty close. I am going to attach the motors and do some paper tests next. We'll see...
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
MDF or ply for JGRO router? carlnpa JGRO Router Table Design 31 12-17-2007 11:15 AM
Newbie CAM questions WoodSnarfer General CAM Discussion 3 11-12-2004 08:15 AM
Questions - Micro CNC router? DarkWolf DIY-CNC Router Table Machines 36 10-22-2004 10:24 AM
Mastercam Router Questions bsmith DIY-CNC Router Table Machines 5 06-02-2004 10:18 PM
Wood Router Plans questions CNCadmin DIY-CNC Router Table Machines 23 03-24-2004 12:09 AM




All times are GMT -5. The time now is 09:05 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353