![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| Hyundai Kia machine Discuss hyundai kia machine here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#2
| |||
| |||
| wow it made a mess of what and how I typed it all. the text is all goofed up and intermingled with the program sorry I'll fix it when I get time. % :1234 G91G28Z0 G91G28X0Y0 <-- these lines get stuff outa the way for tool change T2M6 depending of course on the machine and the way (t2 is the drill) your home positions are set G54G90G0G98 <--G98 X0.0Y0.0 (X zero and y zero are the hole location) G43H2Z1.0 G83Z-1.0R.1Q0.07F2.5 <--G83 is peck with retract to last z with G98 X3.0 G73 is peck with no retract to use it just G80M9 put it in place of G83 end of canned cycle M5 G99 will stop at R point then move G91G28Z0 G98 will stop at last z dimension G91G28X0Y0 G80 is the command to cancle the canned M30 cycles, such things as G73 and G83 % are canned cycles, ie little sub programs called macro's, that use decision making commands. I made the program to show how to set it up. G83 is the call for the sub program ie macro Z-1.0 is how far down from Z zero the drill point will go R.1 is the return point .1 would be plus .1 above Z zero Q0.07 is the amount of peck, the drill goes .07 then lifts up F2.5 is the feed rate in inches per minute X3.0 would move to that hole location and drill. If just one hole then just move up the G80 and no x or y location. Hope this helps |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| G99/G98 in peck drilling cycle | inflateable | EdgeCam | 4 | 10-24-2008 08:21 AM |
| changing dwell in peck cycle | cncmedcom | Post Processor Files | 0 | 02-03-2007 02:31 AM |
| peck tapping cycle | jdsmith0524 | General Metal Working Machines | 9 | 12-16-2006 11:36 PM |
| fanuc -om peck cycle | PETE1968 | Fanuc | 4 | 04-05-2006 10:57 PM |
| G83 peck Drill cycle | Vaughan | G-Code Programing | 24 | 03-19-2004 12:11 PM |