CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking Machines > Haas Mills


Haas Mills Discuss Haas machinery here!


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 08-04-2009, 01:41 PM
 
Join Date: Jul 2009
Location: usa
Posts: 25
The CNC Noob is on a distinguished road
z axis work piece offset

Where do you guys generally get this measurement from using a hs1 ( z axis measurement)? I got the x and y but dont know what to do with the z.
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 08-04-2009, 06:11 PM
 
Join Date: Jan 2008
Location: usa
Posts: 181
fuzzyracing1967 is on a distinguished road

Well with a few exptions for me it will allways be 0.I like to program off the top of the part so the z work offset stays 0 and the tool offset will be -.This way if you are drilling a hole 1. deep your program will be something like (G73 X0 Y0 Z-1. R.1 Q.25 F5. ).
__________________
Just push the button,what's the worst that could happen.
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 08-04-2009, 06:24 PM
 
Join Date: Jul 2009
Location: usa
Posts: 25
The CNC Noob is on a distinguished road

The reason for asking is this. The person who programmed the part has moved on and I have never set up any parts that he has programmed. The setup guy went with him too. So is there any way that I can tell if it was programmed to be run with the z axis work piece offset set at 0? I looked at the z work piece offset on the previous job and it was set at -6.784 with a sentence written on the set up sheet that this is the distance from the center of the tombstone to the surface of the fixture. So now im not sure. Please any advice will be very helpful.
Thanks
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 08-04-2009, 06:54 PM
 
Join Date: Jan 2008
Location: usa
Posts: 181
fuzzyracing1967 is on a distinguished road

What that meens is the program was writin as z0 was the center of the tombstone.So if you were to set your tool offsets off the surface of the parts and ran the program your tools would stay away from your parts by 6.784, so then if you put z-6.784 in the z WORK offset the tools would then cut the parts,ASSUMING THAT IS WHERE THE TOOLS SHOULD BE TOUCHED OFF.For instence we have a old hmc that the z work offset is allways -36.(center of table to spindle) and the z tool offsets are +,becouse tools are musred off line.Did I confuse you yet,,look at the program and the print and see if things match up,say a hole 1. deep does the program say z-1.? If it does then thats the surface to set tools off of.
__________________
Just push the button,what's the worst that could happen.
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 08-04-2009, 07:09 PM
 
Join Date: Jul 2009
Location: usa
Posts: 25
The CNC Noob is on a distinguished road

Thanks alot that clears things up a bit. The setup sheet does say to touch all the tools off of the surface of the fixture and sweep a predrilled hole to get x and y work piece offset. It didnt mention z so I was lost. Thanks again.
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 08-04-2009, 07:18 PM
 
Join Date: Jan 2008
Location: usa
Posts: 181
fuzzyracing1967 is on a distinguished road

Trust me I'v seen it done every witch way posible,sometimes with bad results,(ever hear a 2.5 hss drill brake whille trying to move in x while drill was still 4. in the hole,sounded like a shot gun).If you are not shore the best thing to do is put a + number in the z work offset and single block when you run the first peice that way you shouldn't crash right away .
__________________
Just push the button,what's the worst that could happen.
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Is there a way to offset the piece I want to cut? atwooddon Mach Software (ArtSoft software) 2 07-14-2009 09:36 AM
No U-axis input possible in Work offset Stebedeff Fanuc 4 01-28-2009 12:40 PM
Problem- 6M-B 4th & 5th axis work offset changes R-Bob Fanuc 0 10-08-2008 01:33 PM
Cutting a work piece. alexccmeister General Metalwork Discussion 12 03-20-2007 02:02 AM
RFQ: Lathe work, one piece. SCCoupe Employment Opportunity 2 07-24-2006 06:58 AM




All times are GMT -5. The time now is 12:01 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353