Results 1 to 2 of 2

Thread: need help on program 1/2-4 2 star thread

  1. #1
    Registered
    Join Date
    Nov 2004
    Location
    usa
    Posts
    23
    Downloads
    0
    Uploads
    0

    need help on program 1/2-4 2 star thread

    hi we have a kia skt 21lms lathe with c axis , need help how to
    program 1/2-4 2 star thread . i understand 1 thread start at
    o degreen and the 2nd star at 180.


  2. #2
    Registered djr76's Avatar
    Join Date
    Nov 2007
    Location
    automation alley
    Posts
    314
    Downloads
    0
    Uploads
    0
    The thread lead is .25, so start your first thread at Z.25 and the 2nd thread at Z.125, I would make thread depth per cut shallow because that is gonna be going very fast.


Similar Threads

  1. Thread Mill Program
    By october in forum G-Code Programing
    Replies: 7
    Last Post: 08-13-2012, 12:15 AM
  2. 1/4 NPT External thread program
    By JerryH in forum G-Code Programing
    Replies: 5
    Last Post: 08-28-2008, 08:37 AM
  3. Star
    By TZ250 in forum Dolphin CADCAM
    Replies: 2
    Last Post: 08-27-2007, 08:09 AM
  4. 2-1/2 - 8 NPT Thread Mill Program
    By wesleybridgepor in forum General Metalwork Discussion
    Replies: 2
    Last Post: 11-30-2006, 05:56 AM
  5. Need Star in .dxf
    By rcazwillis in forum General CAM Discussion
    Replies: 12
    Last Post: 12-29-2005, 06:16 AM

Posting Permissions


 


About CNCzone.com

    We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

Follow us on

Facebook Dribbble RSS Feed


Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.