Old 04-10-2007, 10:48 AM
Scott_bob's Avatar
Mfg Engineer
 
Join Date: Nov 2003
Location: United States
Posts: 458
Scott_bob is on a distinguished road
What is your monthly cost of Electicity

It may be interesting to know what people pay for Electricity in various parts of the US.

In order to make comparisons we would need some guidlines:

1) Total Horse Power of your Equipment
2) Line Voltage (220 or 480)
3) Number of Hours of operation per month

Equipment efficiency varies a great deal, as well as power company rates.
But it may be interesting to see these costs relative to your location.
You Electrical guys, let me know what I am missing...
__________________
Scott_bob

Last edited by Scott_bob; 04-10-2007 at 12:51 PM.
Reply With Quote

  #2  
Old 04-10-2007, 11:22 PM
Gold Member
 
Join Date: Nov 2005
Location: USA
Age: 69
Posts: 440
Adobe Machine is on a distinguished road

1) 40, not including a tig welder, a mig welder and a plasma cutter all 220 equip. Also not including some table and circular saws.
2) Line volts, 220 residential
3)before being hospitalized, at least 60 hrs or more per month
4) " " " average bill was $275-300/mo, after I could no longer "Play", dropped to $150/month ( my wife said "I tole you so")

Adobe (old as dirt)
Reply With Quote

  #3   Ban this user!
Old 04-11-2007, 12:50 AM
 
Join Date: Feb 2007
Location: USA
Posts: 424
in2steam is on a distinguished road

Originally Posted by Scott_bob View Post
It may be interesting to know what people pay for Electricity in various parts of the US.

In order to make comparisons we would need some guidlines:

1) Total Horse Power of your Equipment
2) Line Voltage (220 or 480)
3) Number of Hours of operation per month

Equipment efficiency varies a great deal, as well as power company rates.
But it may be interesting to see these costs relative to your location.
You Electrical guys, let me know what I am missing...
If you are talking about a comercial shop in my area you pay by power factor, the worse the power factor is the more you pay, so you are going to be comparing apples to oranges in most cases with your question. Also line voltage has little to do with it, you pay by the service not so much the votlage unless you are on single phase residential then you pay by watts(consumed). Typically in wisconsin you get a 3 phase hook up at a flat rate for the power rating coming in. After a certain rating they monitor you to see your lag, these are built into the transformer, so voltage matters little on 3 phase hook up it just improves your PF if you run alot of inductive loads.
This is why you see companies that have larger metling operations only do it at night as its cheaper in a lot of casses, the power is usally nearer unity(100% PF)

For instance I have 6 services coming into my plant 1 480 3 phase, 2 residential 240 3 phases and 3 240 3 phases comercial, this isnt a typical "plant" as we on the edge of a res. area and have expaned several times. The res. services cost more then the comercial as they are on watt meters, wereas the comercial are current transformers, these only record lag.
This why you often see comapnies more concerned about power factor correction then how much they actually use. The funny thing is we "use" more on the comercial services then on the res. services.

chris
Reply With Quote

  #4  
Old 04-11-2007, 09:09 AM
Scott_bob's Avatar
Mfg Engineer
 
Join Date: Nov 2003
Location: United States
Posts: 458
Scott_bob is on a distinguished road

Thanks Chris for that info.

There is a simple formula that I use to determine how many amps are required to run a shop. The formula is based on full load amps which does not really mean that you will ever draw the full load, but it is a good guideline. Another thing to consider are your local electrical codes which often require that the breakers in your panel be sized at 125% of the full load amp rating on any particular connection.

The formula is as follows.
Total HP and multiply by .745 and then multiply by 1000 and then divide by your line voltage. This will give you the total number of amps required.
Here is an example. Your total combined HP for your shop equipment is 65 and your shop voltage is 220.

65 x .745=48.525(Total Kw)
48.525 x 1000=48,425(total watts)
48,425/220v=220.11 Amps(watts/volt=Amps)

Lighting and other loads (coffee pot, micorwave) which can be estimated at 2,000 kWh per macine cell. You can simply add the this total to the total above before you divide by the volts. Simple rule: Watts/Volts=Amps

Minimal single Machine cell Example:
20hp Haas CNC VMC
+10hp compressor
=30*.745=22.35 (kW) *1000=
=22,350 (total watts)
+ 2,000 kWh (for lights and basics)
=24,350 / 220v =111 Amps
__________________
Scott_bob
Reply With Quote

  #5   Ban this user!
Old 04-11-2007, 11:58 AM
 
Join Date: Feb 2007
Location: USA
Posts: 424
in2steam is on a distinguished road

You have some interesting ideas, this would work well in a small shop area, or cell, if you have dedicated power to each area through either a bus or panel. But it would not work in any plant area that I have worked in, mainly because you are thinking local, when I have lights wired its in banks, often 50-60 on one or two breakers. My machines have there breakers set to what ever the manufacture states, not 125% of that, after that you either rate the circuit to NEC like 15 amps on a 120 branch etc. Simple fact of the matter is that in complex machine you cannot figure out what a HP rating is, of course my presses run well over 100' long with multiple 3 phase motors every few feet.

I think you would be more accurate doing it the way my engineers figured load when I worked at leeson, because you are not taking to factor single phase motors, transformers, eff, and PF, which in inductive loads tend to add up(most 1 hp motors are rated at 1000 watts no?), they just simply take your HPx1000-(10%) this now you effective KW rating. So in your example of 65 HP you would have 65000 watts of power usage(or 295 amps- 10% or 266), this will put you into a realistic range of power rating and make up for variances in amp ratings of different types of motors/processes.
And to say that you never use FLA would also be in error, in the case of HVAC its almost always, pegged to FLA, I have 3 30 HP air handlers, running 30 HP worth of air at all times, and then the compressors to boot when called for.

Larger motors demand more attention for the obvious reasons, and they tend to be more eff. in the end.

If you were to do this in plant that runs allot of dynamic processes you would find you are fairly close. I do like that 2000 kwh for other stuff, its rare that you have problems with electrical fed to a machine in terms of trips, its always the dammed coffee machine.....

Chris
Reply With Quote

Sponsored Links
Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
150usd low cost injection moulding machine ahmedrehan General Metal Working Machines 67 11-22-2011 04:02 PM
anybody need low cost laser engraving cutting machine?? wklaser CNCzone Club House 0 10-23-2006 08:06 PM
Low cost idea for machine ways. Thoughts? jstuedle DIY-CNC Router Table Machines 11 06-28-2006 07:05 PM
How much does it cost? CnC_BoY Bridgeport and Hardinge Mills 1 04-13-2006 03:30 PM
Ancient of days needs help in building low cost cnc wood router machine ageofaquarius21 CNCzone Club House 2 01-25-2006 07:54 AM




All times are GMT -5. The time now is 03:07 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361