  #1   Ban this user!
Old 02-16-2009, 07:18 PM
 
Join Date: Feb 2009
Location: USA
Posts: 12
MikeGT40 is on a distinguished road
Choosing a CNC Lathe - Turning Center

I am looking to purchase a CNC Lathe/Turning Center.

Short story, I design and assemble liquid handling systems typically used in testing labs. I have a requirement to machine cylindrical parts which have several holes located on the perimeter of the part. Sample image attached. I do not own a Mill yet and would like the Lathe to perform this operation.

I called several CNC Lathe/Turning Center manufacturers and when I mentioned Live Tooling and the prices seemed to quadruple! Is it possible to machine these holes on the perimeter of the part on a lathe without Live Tooling (I may not understand the definition of Live Tooling, maybe I should be asking for some other type of process)?

Can anyone recommend a machine (I want to purchase new) which would fit my needs and cost less than $45K?
Thanks.
Attached Thumbnails
Click image for larger version

Name:	RoundPart.jpg‎
Views:	51
Size:	12.0 KB
ID:	75860  
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 02-17-2009, 05:44 AM
 
Join Date: May 2006
Location: Denmark
Posts: 569
Guldberg is on a distinguished road

I think you got i right, but dont thrust my word alone. You need live tooling to do the holes in the perimeter. With live tooling you need the spindle to be able to position the workpiece precisely and the tooling turret becomes more complex, hence the higher price. Are you going to make millions of parts? Othervise a second manual drilling operation in a jig designed for the purpose might work just as well
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 02-17-2009, 05:58 AM
 
Join Date: Mar 2008
Location: USA
Posts: 426
PixMan is on a distinguished road

I can't tell from the photo, so tell me what is the maximum diameter you expect to be doing for that type of part? That's the first thing to set; what size machine do you need?

Next, how many to make over what period of time? Any of those holes have to be off-center, or any flats to be milled (as in, would need a Y-axis movement.) What materials ? (Helps determine required HP.) Using bar stock?

If those parts are under 1-1/4" (32mm) a sliding headstock (Swiss-type) machine might be best, and some rather inexpensive ones have live tooling with Y-axis.
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 02-17-2009, 08:40 AM
 
Join Date: Feb 2009
Location: USA
Posts: 12
MikeGT40 is on a distinguished road

Guldberg, PixMan
Thanks for the info.
Most parts have a maximum diameter of 1.5". 60% are aluminum and 40% are titanium. Number of pieces will vary from 1 to 600. All holes on the perimeter are not off-set. Some parts do require machined flats. In most cases bar stock will not be used.
Thanks.
Tweet this Post!Share on Facebook
Reply With Quote

  #5  
Old 02-17-2009, 12:05 PM
DareBee's Avatar
Monkeywrench Technician
 
Join Date: Jan 2004
Location: Stratford, Ont. Canada
Posts: 2,737
DareBee is on a distinguished road

You will need live tooling to do it in one machine.
I can't imagine you will get a new one for $45k, maybe $90k for a Taiwanese.
__________________
www.integratedmechanical.ca
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 02-18-2009, 11:31 PM
 
Join Date: Feb 2009
Location: USA
Posts: 12
MikeGT40 is on a distinguished road

Ok. I've spent the last 2 days meeting and talking to various Lathe manufacturers (Okuma, Mori Seiki, Sharp, Mazak, Doosan, Milltronics just name a few) and just came to the realization that I need to increase my budget to buy a 3 axis CNC with live tooling.
Tweet this Post!Share on Facebook
Reply With Quote

  #7   Ban this user!
Old 02-18-2009, 11:59 PM
 
Join Date: Feb 2009
Location: United States of America
Posts: 8
hernando is on a distinguished road

Hello,

The part could be done on a lathe with a bar feeder and live tooling. A great part for this set-up. However 45k is a number that will not get you there. You could get an used lathe and do the hole manually in a drill press. This option could fit your budget. Live tool attachments cost between 1800 to 3500 and up. Unless you could justify this expense and the return on investment, drill press will do the job.
A lathe with live tools require a bit of training and know how. Some lathes out there come with conversational programming that could aid but others will require of you learning a CAM software.
Good luck!
Tweet this Post!Share on Facebook
Reply With Quote

  #8   Ban this user!
Old 02-19-2009, 12:07 AM
 
Join Date: Jul 2005
Location: Canada
Posts: 11,419
Geof will become famous soon enough

Originally Posted by MikeGT40 View Post
.....Most parts have a maximum diameter of 1.5". 60% are aluminum and 40% are titanium. Number of pieces will vary from 1 to 600. All holes on the perimeter are not off-set. Some parts do require machined flats. In most cases bar stock will not be used.
Thanks.
You need to budget at least $150,000 if you want a lathe with live tooling but for about half this amount you could get a Haas TL1-P and a Haas TM1-P and these would make your parts.
__________________
An open mind is a virtue...so long as all the common sense has not leaked out.
Tweet this Post!Share on Facebook
Reply With Quote

  #9   Ban this user!
Old 02-19-2009, 01:38 AM
 
Join Date: Jul 2004
Location: Canada
Posts: 601
DSL PWR is on a distinguished road

I was in the same boat as you not that long ago. I looked at Haas, Doosan, DMG, Mori, Okuma, and Hyundai-Kia. I looked at everything from a simple 2 axis lathe to a live tooled, subspidle with y axis. The basic lathe starts out 70-100k (yes there are cheaper ones but I'm starting of with a basic platform that is common to the decked out models) then each option is 25-30k. The option prices are very close on all of the brands. So if you want live tools you add 30k, and its about the same for a subsindle and y axis.

The only one that stood out in the pricing is the DMG ecoline. For 10k you get a 6 station live turret. I fell in love with the control at IMTS. The ecoline pricing puts DMG in the Haas and Doosan price range. The regular DMG is up there with Mori.

I was down to 3 machines, a Doosan 240msb(live tool subspindle) 2000y(live tool with yaxis), both were about the same money, and a DMG 310eco with live tools.

Long story short the DMG by the time it would be tooled up and on my floor would have been about 100-120k, and the Doosan would have been 130-145k.

The more I looked at the y axis machines the more I realised you need a specific product to justify the extra money, and you still only get 3-4" of y travel. I know you aren't looking for y axis, but once you get up in price it is sure tempting just to jump in so you have it for some future job.

I currently have a Haas TM-1, and just bought a used 2 axis lathe. It is an off brand (Yang), but has a Fanuc control, and I saw it running production on a Friday, and it was loaded on my trailer the following Monday. It was cheap enough (I spent more on tooling on my 1st order, than on the lathe!) that I bought a new rotary table for my Haas. This will allow me to do everything that a live tooled lathe can do and much more. From what I can figure I should be pretty close on production time with 2 spindles, and some good fixturing on the 4th mill axis, as with a live tooled lathe.

So I can do what I need with 2 machines for about 50k, instead of 150k.

I would (and did) look at 2 machines, and even look at used for your product. 45k might get you what you need if you have time to wait for the right deal, and slowly build up your tooling. How many widgets do you need to make to pay for a 100k upgrade?

Good luck
__________________
On all equipment there are 2 levers...
Lever "A", and Lever F'in "B"
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Spectralight turning center roni21702 General CNC (Mill and Lathe) Control Software (NC) 4 04-04-2010 11:21 AM
Out of center axle turning? fizzman General Metalwork Discussion 10 09-26-2007 03:03 PM
Turning Center G40 G41 and G42 jorgehrr G-Code Programing 16 04-13-2007 11:48 PM
Turning center sale bdrmachine General Metal Working Machines 0 01-09-2007 08:23 PM
Threading on turning center dholt General Metal Working Machines 11 10-20-2006 03:05 PM




All times are GMT -5. The time now is 06:31 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353